ML19052A568
ML19052A568 | |
Person / Time | |
---|---|
Issue date: | 02/20/2019 |
From: | Jessica Chu Acquisition Management Division |
To: | Mcelwain M Oasis Systems |
References | |
GS06F0641Z | |
Download: ML19052A568 (15) | |
Text
1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 15
- 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
M0033 02/21/2019 See Schedule
- 6. ISSUED BY CODE NRCHQ 7. ADMINISTERED BY (If other than Item 6) CODE US NRC - HQ ACQUISITION MANAGEMENT DIVISION MAIL STOP TWFN-5E03 WASHINGTON DC 20555-0001
- 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
OASIS SYSTEMS LLC ATTN MICHAEL MCELWAIN 9B. DATED (SEE ITEM 11) 24 HARTWELL AVENUE LEXINGTON MA 024213160 x 10A. MODIFICATION OF CONTRACT/ORDER NO.
GS06F0641Z NRC-HQ-10-14-T-0001 10B. DATED (SEE ITEM 13)
CODE FACILITY CODE 02/19/2014 176018810
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning ___________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
- 12. ACCOUNTING AND APPROPRIATION DATA (If required) Net Increase:
See Schedule
- 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X FAR 52.232-22 E. IMPORTANT: Contractor x is not is required to sign this document and return __________________ copies to the issuing office.
- 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this modification is the following:
- 1) increase the task order's ceiling by and 2) Attach WAF(s).
Please see continuation pages for more details.
SUMMARY
OBLIGATION: (changed)
EXERCISED CEILING:$ (changed)
OVERALL CEILING: $ (changed)
Period of Performance: 02/21/2014 to 02/20/2020 Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
JESSICA CHU 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16C. DATE SIGNED 02/20/2019 (Signature of person authorized to sign)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 2 of 15 1.) The below task orders are shifted to this task order. All new Work Assignment Form(s) will be added under this task order.
NRC-HQ-25-14-T-0001 - NRO 2.) Excess Ceiling from CFO task order in the amount of $150,000.00 moved to CLIN 01010.
CLIN 01010 is increased by the following:
From:
By:
3.) The CLIN 06010 is hereby added to CLIN structure as follows:
Task Order CLIN Description NRC-HQ-10-14-T-0001 06010 NRO 4.) NRC-HQ-25-14-T-0001 (NRO) excess Ceiling from CLIN 01010 in the amount of and Option year 5 Ceiling (CLIN 50001) in the amount of
$ 5 totaling moved to CLIN 50001, and Option 6-8 ceilings totaling in the amount of $316,543. moved to this task order as follows:
OPTION OPTION OPTION OPTION YEAR 5 YEAR 6 YEAR 7 YEAR 8 TASK ORDER OFFICE CLIN 50001 CLIN 60001 CLIN 70001 CLIN 80001 TOTAL NRC-HQ-10-14-T-0001 OCIO NRC-HQ-25-14-T-0001- NRO NEW TOTAL NRC-HQ-10-14-T-0001 5.) Excess Ceiling from Option Year 5 in the amount of moved to CLIN 06010.
Option Year 5 Ceiling decreased by the following:
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 3 of 15 From:
By: $
To:
CLIN 06010 increased by the following:
From:
By:
To:
The Task Orders new total exercised ceiling is increased by to be The Task Orders total ceiling is hereby increased to 6.) Under Option Year 5, this modification authorizes LH and FFP performance under WAF(s), 00001-026F, 00001-28G, 00001-30C, 00001-36C, 00001-37C, 00001-38C, 00001-40C, 00001-41C, 00001-48C, 00001-58E, 00001-62B, 00001-64B, 00001-65B, 00001-68B, 00001-69, 00001-70, 00002-71, 01010-006A, 01010-008A, 01020-002B, 01020-003A, 01020-004, 01030-002B, 01030-004A, 01030-005, 01030-006, 01030-007, 01040-003A, 01040-004, 01050-002B, 01060-002B, 01060-003 01060-004, 01070-001B, 01070-002, 02010-001B, 02010-002A, 02010-003C, 02010-005, 03010-003, 03020-003, 03020-004, 06010-001, 06010-002, 06010, 003, 06010-004 and 03010-002A (see attachment(s)). Attachment(s) shall be incorporated as Task Order Attachment(s) as follows.
Attachment 156 - 00001-26F Attachment 157 - 00001-28G Attachment 158 - 00001-30C Attachment 159 - 00001-36C Attachment 160 - 00001-37C Attachment 161 - 00001-38C Attachment 162 - 00001-40C Attachment 163 - 00001-41C Attachment 164 - 00001-48C Attachment 165 - 00001-58E Attachment 166 - 00001-62B Attachment 167 - 00001-64B Attachment 168 - 00001-65B
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 4 of 15 Attachment 169 - 00001-68B Attachment 170 - 00001-69 Attachment 171 - 00001-70 Attachment 172 - 00002-71 Attachment 173 - 01010-006A Attachment 174 - 01010-008A Attachment 175 - 01020-002B Attachment 176 - 01020-003A Attachment 177 - 01020-004 Attachment 178 - 01030-002B Attachment 179 - 01030-004A Attachment 180 - 01030-005 Attachment 181 - 01030-006 Attachment 182 - 01030-007 Attachment 183 - 01040-003A Attachment 184 - 01040-004 Attachment 185 - 01050-002B Attachment 186 - 01060-002B Attachment 187 - 01060-003 Attachment 188 - 01060-004 Attachment 189 - 01070-001B Attachment 190 - 01070-002 Attachment 191 - 02010-001B Attachment 192 - 02010-002A Attachment 193 - 02010-003C Attachment 194- 02010-005 Attachment 195 - 03010-003 Attachment 196 - 03020-003 Attachment 197 - 03020-004 Attachment 198 - 06010-001 Attachment 199 - 06010-002 Attachment 200- 06010-003 Attachment 201 - 06010-004 Attachment 202 - 03010-002A 7.) CLIN 00001 Obligations are added as follows:
WAF 00001-26F: Total is This is to extend the period of performance.
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 5 of 15 WAF 41: Total is (LH)
Incrementally funded at $ (Mod 19)
Unassign $ (Reassign to WAF 00001-28G)
Requisition: CFO-16-0068 Accounting Code: 2016-X0200-FEEBASED-7N-7ND001-11-5-156-6030-252A This is incrementally funded at WAF 30B: Total is $ (LH)
Incrementally funded at $ 0 (Mod 23)
Unassign $ Reassign to WAF 00001-28G)
Requisition: OCIO-17-0164 Accounting Code: 2017-X0200-FEEBASED-10-10D010-6095-51-J-145-252A-5 1-J-145-6095 This is incrementally funded at WAF 00001-28G: Total is Reassign (Reassign funds from WAF 41)
Reassign (Reassign funds from WAF 30B)
This is incrementally funded at WAF 00001-30C: Total is This is to extend the period of performance.
WAF 00001-36C: Total is This is to extend the period of performance.
WAF 00001-37C: Total is This is to extend the period of performance.
WAF 00001-38C: Total is This is to extend the period of performance.
WAF 00001-40C: Total is This is to extend the period of performance.
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 6 of 15 WAF 00001-41C: Total is This is to extend the period of performance.
WAF 00001-48C: Total is This is to extend the period of performance.
WAF 00001-58E: Total is This is to extend the period of performance.
WAF 00001-62B: Total is This is to extend the period of performance.
WAF 00001-64B: Total is This is to extend the period of performance.
WAF 00001-65B: Total is This is to extend the period of performance.
WAF 00001-68B: Total is This is to extend the period of performance.
WAF 58C: Total is Incrementally funded at (Mod 25)
Unassign: (Reassign to WAF 00001-69)
Requisition: NMSS-17-0144 Accounting Code: 2017-X0200-FEEBASED-50-50D099-6019-34-4-156-252A 4-156-6019 This is incrementally funded at .
WAF 00001-69: Total is $
Reassign from WAF 00001-58C.
This is fully funded.
WAF 58B: Total is $
Incrementally funded at (Mod 23)
Unassign (Reassign to WAF 00001-70)
Requisition: NMSS-17-0083
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 7 of 15 Accounting Code: 2017-X0200-FEEBASED-50-50D099-6019-34-4-156-252A 4-156-6019 This is incrementally funded at WAF 00001-70: Total is Reassign from WAF 00001-58B.
This is fully funded.
Therefore, the Total CLIN 00001 LH Obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligations changes, CLIN 00001 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the LH ceiling.
8.) CLIN 00002 FFP Obligations are added as follows:
WAF 00002-71: Total is Fully funded at Prior year unassigned funds.
This is fully funded.
Therefore, the Total CLIN 00002 FFP Obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligations changes, CLIN 00002 has a ceiling of and a total obligation of , therefore remains unfunded and available to fund under the CLIN 00002 ceiling.
9.) CLIN 01010 Obligations are added as follows:
WAF 01010-002B: Total is (LH)
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 8 of 15 Incrementally funded at (Mod 29)
Reassign from WAF 01010-008 Requisition: OCIO-17-0164 Accounting Code: 2017-X0200-FEEBASED-10-10D010-6095-51-J-145-252A-5 1-J-145-6095 This is incrementally funded at WAF 01010-006A: Total is (LH)
No funding provided with this modification.
WAF 01010-008: Total is (FFP)
Incrementally funded at (Mod 29)
Unassign (Reassign to WAF 01010-008A)
Requisition: OCIO-18-0337 Accounting Code: 2018-X0200-FEEBASED-10-10D010-6143-51-J-144-2574 J-144-6143 Unassign (Reassign to WAF 01010-008A)
Requisition: NRR-18-0177 Accounting Code: 2018-X0200-FEEBASED-20-20D099-6015-11-5-156-251A 5-156-6015 Unassign (Reassign to WAF 01010-002B)
Requisition: NRR-18-0177 Accounting Code: 2018-X0200-FEEBASED-20-20D099-6015-11-5-156-251A 5-156-6015 This WAF replaced by WAF 01010-008A.
WAF 01010-008A: Total is (FFP)
Reassign (Reassign fund from WAF 01010-008)
Reassign (Reassign funds from WAF 01010-008)
This is incrementally funded at for 2 months.
Therefore, the Total CLIN 01010 obligations shall be increased as follows:
From:
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 9 of 15 By:
To:
As a result of the ceiling and obligation changes, CLIN 01010 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01010 ceiling.
10.) CLIN 01020 Obligations are added as follows:
WAF 01020-002B: Total is (LH)
Incrementally funded at Requisition: SECY-19-005 Accounting Code: 2019-X0200-FEEBASED-7L-7LD001-6149-51-L-156-2574 L-156-6149 This is incrementally funded at WAF 01020-003A: Total is This is to extend the period of performance.
WAF 01020-004: Total is (FFP)
Incrementally funded at (for three quarters)
Requisition: SECY-19-005 Accounting Code: 2019-X0200-FEEBASED-7L-7LD001-6149-51-L-156-2574 L-156-6149 This is incrementally funded for three quarters.
Therefore, the Total CLIN 01020 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01020 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01020 ceiling.
11.) CLIN 01030 Obligations are added as follows:
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 10 of 15 WAF 01030-002: Total is (LH)
Incrementally Funded at (Mod 27)
Incrementally Funded at (Mod 28)
Unassign (Reassign to WAF 01030-005)
Requisition: NMSS-18-0066 Accounting Code: 2018-X0200-FEEBASED-50-50D099-6019-34-4-156-252A 4-156-6019 This is incrementally funded at .
WAF 01030-002B: Total is (LH)
No funding provided with this modification.
WAF 01030-004A: Total is (FFP)
This is to extend the period of performance.
WAF 01030-005: Total is (FFP)
Reassign $ (Reassign from WAF 01030-002)
This is incrementally funded at for 2 quarters.
WAF 01030-006: Total is (FFP)
No funding provided with this modification.
WAF 01030-007: Total is (FFP)
No funding provided with this modification.
Therefore, the Total CLIN 01030 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01030 has a ceiling of and a total obligation of , therefore remains unfunded and available to fund under the CLIN 01030 ceiling.
12.) CLIN 01040 Obligations added as follows:
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 11 of 15 WAF 01040-003A: Total is (LH)
This is to extend the period of performance.
WAF 01040-004: Total is (FFP)
Incrementally funded at Requisition: OCIO-19-0070 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6056-51-J-144-252A-5 1-J-144-6056 This is fully funded.
Therefore, the Total CLIN 01040 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01040 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01040 ceiling.
13.) CLIN 01050 Obligations added as follows:
WAF 01050-002B: Total is (LH)
No funding provided with this modification.
Therefore, the Total CLIN 01050 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01050 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01050 ceiling.
14.) CLIN 01060 Obligations added as follows:
WAF 01060-002B: Total is $ (LH)
No funding provided with this modification.
WAF 01060-003: Total is (FFP)
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 12 of 15 Incrementally funded at .
Requisition: OCIO-19-0070 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6056-51-J-144-252A-5 1-J-144-6056 This is incrementally funded at for 2 quarters.
WAF 01060-004: Total is (FFP)
No funding provided with this modification.
Therefore, the Total CLIN 01060 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01060 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01060 ceiling.
15.) CLIN 01070 Obligations are added as follows:
WAF 01070-001B: Total is LH)
This is to extend the period of performance.
WAF 01070-002: Total is (LH)
No funding provided with this modification.
Therefore, the Total CLIN 01070 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 01070 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 01070 ceiling.
16.) CLIN 02010 Obligations are added as follows:
WAF 02010-001B: Total is (LH)
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 13 of 15 No funding provided with this modification.
WAF 02010-002A: Total is (LH)
No funding provided with this modification.
WAF 02010-003C: Total is (FFP)
This is to extend the period of performance.
WAF 02010-005: Total is (LH)
No funding provided with this modification.
Therefore, the Total CLIN 02010 obligations shall be increased as follows:
From:
By:
To: $
a result of the ceiling and obligation changes, CLIN 02010 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 02010 ceiling.
17.) CLIN 03010 Obligations are added as follows:
WAF 03010-002A: Total is LH)
This is to extend the period of performance.
WAF 03010-003: Total is (FFP)
No funding provided with this modification.
Therefore, the Total CLIN 03010 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 03010 has a ceiling of and a total obligation therefore remains unfunded and available to fund under the CLIN 03010 ceiling.
18.) CLIN 03020 Obligations are added as follows:
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 14 of 15 WAF 03020-003: Total is 9 (FFP)
No funding provided with this modification.
WAF 03020-004: Total is )
No funding provided with this modification.
Therefore, the Total CLIN 03020 obligations shall be increased as follows:
From:
By:
To:
As a result of the ceiling and obligation changes, CLIN 03020 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 03020 ceiling.
19.) CLIN 06010 Obligations are added as follows:
WAF 06010-001: Total is $ (FFP)
Fully funded at Requisition: OCIO-19-0050 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6107-17-4-156-251B 4-156-6107 This is fully funded.
WAF 06010-002: Total is (FFP)
Fully funded at $
Requisition: OCIO-19-0050 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6107-17-4-156-251B 4-156-6107 This is fully funded.
WAF 06010-003: Total is (FFP)
Fully funded at Requisition: OCIO-19-0050 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6107-17-4-156-251B 4-156-6107
GS06F0641Z NRC-HQ-10-14-T-0001 Modification 33 Page 15 of 15 This is fully funded.
WAF 06010-004: Total is (LH)
Fully funded at $
Requisition: OCIO-19-0050 Accounting Code: 2019-X0200-FEEBASED-10-10D010-6107-17-4-156-251B 4-156-6107 This is fully funded.
Therefore, the Total CLIN 06010 obligations shall be increased as follows:
From: $
By:
To:
As a result of the ceiling and obligation changes, CLIN 06010 has a ceiling of and a total obligation of therefore remains unfunded and available to fund under the CLIN 06010 ceiling.
20.) The Task Orders Total Obligations have therefore been modified as:
From:
By:
To:
All other terms and conditions remain the same.