Memo to C. Regan Summary of April 16, 2019, Pre-Application Mtg. with the Nwp LL and DOE to Discuss the Application for the Rev. of the Model Nos. TRUPACT-II and Halfpact Waste Shipping Container Packages (Dkt. 71-9218 and 71-9279) (W/ Encl
ML19148A136
Person / Time
Site: 07109218, 07109271
Issue date: 05/28/2019
From: Garcia-Santos N
Spent Fuel Licensing Branch
To: Christopher Regan
Division of Spent Fuel Management
Garcia-Santos N
Shared Package
ML19148A139 List:
References
EPID L-2019-LRM-0017
Download: ML19148A136 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 28, 2019 MEMORANDUM TO: Christopher M. Regan, Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Norma García Santos, Project Manager /RA/

Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF APRIL 16, 2019, PRE-APPLICATION MEETING WITH THE NUCLEAR WASTE PARTNERS LLC AND THE UNITED STATES DEPARTMENT OF ENERGY TO DISCUSS THE APPLICATION FOR THE REVISION OF THE MODEL NOS. TRUPACT-II AND HALFPACT WASTE SHIPPING CONTAINER PACKAGES (DOCKET NOS. 71-9218 AND 71-9279)

Background.

On April 16, 2019, a public meeting was held in Rockville, Maryland, at the request of the Nuclear Waste Partners LLC (NWP) and a representative of the United States (U.S.)

Department of Energy (DOE) with the U.S. Nuclear Regulatory Commission (NRC) staff. The meeting was announced by notice dated March 27, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML19086A085 and ML19101A444) as an open meeting. The applicant provided the presentation slides on April 11, 2019 (ADAMS Accession No. ML19101A436). Enclosure 1 includes the list of participants (in person and by phone). Enclosure 2 includes the meeting agenda. Copies of the most recent certificates of compliance (CoC) for the Model No. TRUPACT-II (ADAMS Accession No. ML14174A157) and HalfPACT Waste Shipping Container (thereafter, HalfPACT) (ADAMS Accession No. ML15308A563) were provided at the meeting.

Discussion.

The purpose of the meeting was to discuss details related to an upcoming application from NWP to revise the Model No. HalfPACT to add four shielded containers. The Model No.

HalfPACT is used to transport waste from the DOE facilities to the Waste Isolation Pilot Plant (WIPP). The following section includes a summary of the discussion during April 16th meeting.

CONTACT: Norma García Santos, NMSS/DSFM 301-415-6999

C. Regan I. SCHEDULE The applicant mentioned that it may be submitting an application to revise the design of the Model No. HalfPACT by the end of this calendar year. Therefore, the applicant briefly described the proposed schedule as follows:

1) End - November 2019 - Subcontract for Prototype Fabrication and Testing
2) End - July 2019 - Fabrication of prototypes (Packaging and dummy proposed contents)
3) End - August 2019 - Type A testing.
4) End - November 2019 - Type B testing, hypothetical accident conditions.
5) End - November 2019 - Submit application to NRC
6) End - November 2021 - NRC finalizes the review of the application The staff noted that it may be beneficial for some staff to observe the tests performed to this package. NWP mentioned that it would inform the NRC when they are planning to perform the testing.

II. TECHNICAL DISCUSSION NWP, on behalf of DOE (the CoC holder), briefly discussed background information about WIPP and aspects related to the upcoming application. The WIPP currently receives approximately 10 shipments per week of contact handled waste (CHW). The facility has also received about a total of 700 shipments of remote-handled (RH) transuranic (TRU) waste (thereafter, RH). Per NWP, RH shipments are more complex than CHW shipments.

NWP briefly discussed the information to be submitted in the application. NWP will seek approval to add four shielded payload container designs to the certificate of compliance (CoC) for the Model No. HalfPACT. These containers will be used for transporting 30- and 55-gallon drums. The shielded payload containers, along with ancillary dunnage that is an integral part of the new shielded container design, make up the payload assembly. NWP explained that, among a few issues, events that occurred on February 14, 2014 greatly reduced ventilation of the underground facilities, and concerns about airborne contamination resulted in halting the shipment of RH waste in RH-TRU 72B packages. There are plans to build an additional shaft and install a new ventilation system by 2024/2025. Meanwhile, for these reasons and the delay of future 72B shipments, NWP needs additional alternatives to accommodate shipments of RH waste. (Per NWP about 56% of RH waste is shipped in 55-gallon drums and DOE does not want to repackage these drums.)

NWP and DOE are planning to perform full scale testing for the structural analysis as part of the submittal of this application. NWP is planning to address the following:

1) load distribution
2) shielding failure
3) comparison of the initial analysis (i.e., empirical analysis) of the package with the results of the actual testing.

NWP assumed that the aluminum honeycomb distributes the load of the package during the drop test. (The design uses a General Plastics foam.) The aluminum honeycomb is only used in the HalfPACT package as part of the spacer assemblies used at each end of the inner container vessel (ICV). The ancillary dunnage that is part of the shielded container payload assembly will be foam-filled aluminum shells inside the ICV and adds additional impact

C. Regan absorbing characteristics in addition to the impact limiters installed on the package. Even though the discussion focused on aspects related to the structural analysis, NWP also mentioned that the source term should be the same and that it will be using the same methodology to perform the shielding analysis as in previous applications.

Lastly, the staff pointed out that the applicant should consider providing the following information in the upcoming application:

1) a summary of changes,
2) a comparison of previously approved content and new proposed content,
3) applicability of previous analyses of the package to the new proposed content,
4) a demonstration about how previous analyses bound the proposed new content, and
5) explain how the licensing bases for the package are maintained.

The staff noted that it would be reviewing empirical data to determine if NWP maintained the licensing bases of the package design.

Docket Nos. 71-9218 and 71-9279 EPID No. L-2019-LRM-0017

Enclosures:

1. Meeting Attendees
2. Meeting Agenda cc: Attendees

C. Regan

SUBJECT:

SUMMARY

OF APRIL 16, 2019, PRE-APPLICATION MEETING WITH THE NUCLEAR WASTE PARTNERS LLC AND THE UNITED STATES DEPARTMENT OF ENERGY TO DISCUSS THE APPLICATION FOR THE REVISION OF THE MODEL NOS. TRUPACT-II AND HALFPACT WASTE SHIPPING CONTAINER PACKAGES (DOCKET NOS. 71-9218 AND 71-9279),

DOCUMENT DATE: May 28, 2019 DISTRIBUTION:

DSFM r/f, DMarcano BWhite TTate CBajwa JTapp JWise DTang MRahimi EGoldfeiz JPiotter JSmith JMcKirgan CAraguas YDiaz Sanabria G:\SFST\Garcia\Public Meetings NGS\TK-C69_Public_Meeting_Summary_10-31-18.docx ADAMS Package Accession No.: ML19148A139 Memo: ML19148A136 OFFICE: DSFM E DSFM N DSFM N NAME: NGarcía Santos SFigueroa JMcKirgan DATE: 5/24/19 5/24/19 5/28/19 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

Public Meeting Model Nos. TRUPACT-II and HalfPACT Docket Nos. 71-9218 and 71-9279 April 16, 2019 1:00 P.M. - 3:30 P.M.

Location: TWFN-7-B51 Attendees List Name Organization Travis Tate NRC Norma García Santos NRC Bernard White NRC John Wise NRC Jeremy Tapp NRC Eli Goldfeiz NRC David Tang NRC Chris Bajwa NRC Jeremy Smith NRC Jason Piotter NRC Dan Standiford DOE Todd E. Sellmer NWP Scott Burns NWP Steven A. Porter NWP Enclosure 1

Public Meeting Model Nos. TRUPACT-II and HalfPACT Docket Nos. 71-9218 and 71-9279 Agenda April 16, 2019 1:00 P.M. - 3:30 P.M.

Location: TWFN-7-B51

Purpose:

Discuss information related to the application for revising the certificates of compliance for the Model Nos. TRUPACT-II and HalfPACT.

Outcome:

Clarify questions from the staff regarding application and applicants need for revising the Model Nos.

TRUPACT-II and HalfPACT.

Process:

Opening remarks NRC\NWP Introductions All Discussion of the purpose of the application NWP Discussion of the proposed action NWP Questions NWP\NRC Discussion of next steps NWP\NRC Adjourn meeting All Enclosure 2