NRC-89-0216, Responds to Generic Ltr 89-16, Installation of Hardened Wetwell Vent. Util Working W/Bwr Owners Group to Install Vent,Per 10CFR50.59
| ML19327B378 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/20/1989 |
| From: | Sylvia B DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-89-0216, CON-NRC-89-216 GL-89-16, NUDOCS 8910310069 | |
| Download: ML19327B378 (1) | |
Text
,
r
\
t
. .. a .,,o ,
r c. .m,...,,
P 1 foit ....,,o,...,,.... !
ISOn "i,m="""'" ;
- 3 I i
Cetcber 20, 1989 l i NRC-89-0216 r U. S. Ibclear Regulatory Ccanission Attn Document Control Desk
- r. Washington, D. C. 20555 L
References:
- 1) Fermi 2 l NRC Docket No. 50-341 i NIC License No. NPF-43 L
- 2) NIC Generic Letter 89-16,
- lnstallation of a Hardened Wetwell Vent", date
! Septenber 1, 1989 Subjects pesconse to Generic Istter 89-16 L 'Ihis letter is to provide Detroit Mison's response to NIC Generic Ietter 89-16 (Reference 2) which was received on September 7,1989.
'Ibe Generic letter encourages all plants with Mark I Containments to voluntarily install a hardened wetwell vent under 10CPR50.59, or prwide a plant-spncific cost estinate for inplenentation so that the NRC can perform a plant-specific backfit analysis.
i Detroit Mison has decided to proceed with plant modifications to
- install a hardened wetwell vent under the provisions of 10CFR50.59.
Detroit Mison is working with the BWR Owners' Group on the proposed hardened vent. 'Ibe estinated schedule for coupletion of these i modifications is the end of our third refueling outage; this schMule will be reviewed following determination of the finalized scope.
If you have any questions, please contact Mr. Girije Snukla at (313) 586-4270.
Sincerely,
/Wal jb cc A. B. Davis /
l R. C. Knop W. G. Rogers J. F. Stang 0
l k i 8910310069 091020 pDR ADOCKOSOOg1