From: Gleaves, Billy Sent: Wednesday, December 11, 2019 7:29 AM To: Vogtle PEmails Cc: Rankin, Jennivine
Subject:
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Attachments: Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf These are the first 2 pages from the draft submittal for Vogtle LAR-19-020 on Cyber Security Plan Changes. These will be discussed at a meeting with SNC on 12/12/19.
Billy William (Billy) Gleaves Senior Project Manager NRR/Vogtle Project Office US Nuclear Regulatory Commission The contents of this message may be sensitive. If this message has been received in error, please delete it without reading it. Your receipt of this message is not intended to waive any applicable privilege. Do not disseminate this message without the permission of the author. Communications by this author do not represent NRC policy and are not binding on the Commission.
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 508 Mail Envelope Properties (BL0PR0901MB4387E7B0F55BAEA0E19D63699F5A0)
Subject:
Public Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019)
Sent Date: 12/11/2019 7:29:13 AM Received Date: 12/11/2019 7:29:17 AM From: Gleaves, Billy Created By: Bill.Gleaves@nrc.gov Recipients:
"Rankin, Jennivine" <Jennivine.Rankin@nrc.gov>
Tracking Status: None "Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: BL0PR0901MB4387.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 707 12/11/2019 7:29:17 AM Pages from DRAFT SNC_LAR-19-020 (rF) Pre-Sub Mtg (12-12-2019).pdf 659378 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 December XX, 2019 Docket Nos.: 52-025 ND-19-0000 52-026 10 CFR 50.90 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 mpany Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Ladies and Gentlemen:
AF Cyber Security Plan Changes In accordance with 10 CFR 50.90, Southern amendment to the combined licenses (COLs) endme endment:
Request for License Amendment:
es ((LAR-19-020)
LA 020)
LAR Operatin Company (SNC) requests an ern Nuclear Operating OLs) for Vogtle Electric Generating Ge Plant (VEGP) Units 3 Units 1 through 4, to align enhance certain controls the changes proposed osed in T
and 4 (License Numbers NPF-91 and NPF-92, proposes changes to the VEGP Units The license amendment request the VEGP 1&2 CSP for cyber st (LAR)
NPF--92, respectively).
NPF (LA proposes respectively). The ts 3 & 4 Cyber Security Plan (CS n language in the VEGP Units of the NRC-endorsed CSP template in NEI 08-n this LAR iin U
08-09, 08 n accordance with Re T
(CSP).
requested amendment changes to the VEGP Units 3 & 4 CSP to identify oses chan ber security protection oof digital a assets in systems common to VEGP 3&4 CSP with the corresponding elements
-09, Revision 6, including Addendum 1, and to ols for the protection and safety monitoring system (PMS). SNC has reviewed trols wi the provisions of 10 CFR 50.54(p)(2) and has proposed R
determined thatt a request for prior NRC approval provides the description, Significant sed changes.
ch the requested Enclosure sure 2 identifies uested changes to the VEGP VE approva constitutes the most prudent path forward.
description technical tech ant Hazards Consideration Determination)
Dete De evaluation, regulatory evaluation (including the and environmental considerations for the ntif the requested changes and provides markups depicting identif Units 3 and 4 current licensing basis documents. The D
information n in Enclosures 1 and This letter containss no reg an 2 contains Security-Related Information and, therefore, cannot be disclosed to the public in accordance a
ac with 10 CFR 2.390.
SNC requests NRC staff review and approval of this license amendment request (LAR) no later than May 1, 2020 to support receipt of nuclear fuel for VEGP Unit 3. Delay approval of this license amendment could result in a delay in establishing the VEGP Unit 3 protected area boundary, and a subsequent delay in fuel receipt onsite. SNC expects to implement the proposed amendment within 30 days of approval of the LAR.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia by transmitting a copy of this letter and its enclosures to the designated State Official.
Should you have any questions, please contact Ms. Kelli A. Roberts at (706) 848-6991.
12/12/2019 Pre-Submittal Meeting
U.S. Nuclear Regulatory Commission ND-19-0000 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the XXth of December 2019.
Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company T
Enclosures AF SECURITY-RELATED to Licensing RELATED ng Plant (VEGP) Units
- 1) Vogtle Electric Generating Amendment: Cyber Security Plan Changes ED INFORMATION Unit 3 and 4 - Request for License hanges (LAR-19-020)
INFORMATIO - WITHHOLD THHO g Basis Documents ((LAR-19-020)
D INFORMATION INFORMA - WIT LAR-19 WITHHOLD U 9
(LAR (CONTAINS UNDER 10 CFR 2.390) g Plant (VEGP) Units 3 and 4 - Proposed Changes
- 2) Vogtle Electric Generating (CONTAINS SECURITY-UNDER 10 CFR 2.390)
R D
12/12/2019 Pre-Submittal Meeting