ML20002A678

From kanterella
Revision as of 16:21, 30 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Biweekly Rept 2 as Requested in IE Insp Repts 50-373/80-40 & 50-374/80-26
ML20002A678
Person / Time
Site: LaSalle  
Issue date: 11/05/1980
From: Watts T
COMMONWEALTH EDISON CO.
To: Yin I
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8011210241
Download: ML20002A678 (2)


Text

._

s-

' Commonwealth Edison

'- /Ji;D)\, one First National Pt"Ja. Chicago. filinois g ,

,i G ) Address Reply to: Post Offica Box 767 g _ Chicago. Hiiriois 6069o v

November 5, 1980 3

?!

Mr. I.T. Yin, Re. actor' Inspector _ C ,

United States Nuclear Regulatory Commission .._,

Office of Inspection & Enforcement, Region III  ;; .. ..

799 Roosevelt Road d '

RE Glen Ellyn, Illinois 60137 M s'

.C Mr. Yin:

Attached-is bi-weekly report #2 for LaSalle County Station Unit 1 as requested in Section 4 of your Report No.-50-373/80-40; 50-374/80-26. Section 4a, with schedule and totals, is inclusive.

~

Sections 4b, c, d and e cover this reporting period only.

If you have any questions on this matter, please do not hesitate to call me on (312) 294-2828.

Sincerely,

---.7 E WW T.E. Watts BA/sb/7556A Attachment cc: J.J..Maley B.B. Stephenson B.R. Shelton t.0. De1 George l W.H. Donaldson/M. Lohmann T.E. Quaka

8. Annis R.J. Mazza (S&L)

~

1 l

l l

NOV 6 SED l BOI-I 210 g( Q l

. .. .- S ,

v Y

. 4a. Schedule Milestone'for 2" and under Item- Original Proposed j Submit 1st subsystem packages to S&L 9-15-80 9- 9-80*

4 Receive 1st. subsystem package from S&L 9-29-80 10- 6-80*

25%-of-subsystems complete by S&L 10-20-80 11-17-80 50% of subsystems complete by S&L 11-10-80 12- 1-80 75% of subsystems complete by S&L 12- 1-80 12-22-80 l 100% of subsystems complete by S&L 12-22 12-80

)

i

  • actual date Note: 302'of 543 subsystems have been submitted to S&L 52 subsystems have been completed and returned by_S&L O subsystems have been installed and QC inspected 1

l 4b. During the past two week reporting per od, the design was completed on the 33' subsystems listed below:

CS: 80,-.96, A1, A2, A3,.A5, A7, A8, A9 l 00: A1, A2, A3, A4, AS, A6, A7, A8, 81, 82, B3 7-DG: 66, 67, 77 FC: 63, 66 LC: 81, B2 RH: 59, 94, 01, G2 '

RR: 86,:.09 i

4c. During the past two week reporting period, the following subsystems

!* were installed and QC accepted:

None-i 4d. During the past two week reporting period, the following QA Audits and Surveillances were performed by CECO, with respect to small bore piping:

1 On S&L: -#80-601, 10/24

1-80-96 10/27 3 On MCCo: #80-435, 9/2 80-443 9/4 i 80-447 9/5 80-459 -

9/9 80-464 9/L2

, '80-470 9/1.3 80-476 9/L1 80-478 9/15-80-613 - 10/21' '80-614' 10/21 80-615 11/3

,. -0n NSC: 1-80-94 10/16

  1. 80-604 10/24' Note: The_eight September ~ dates-for Morrison_were' inadvertently-left off the.last' report.

-.4e.- No audit'or surveillance findings.from the above list remain open.

.a.- . , _ - -

,_ . .- - . ._ _ ,, ., ..