Text
~
1 1
I
""cro" h , Update R2 port - Prsvious Report Data 5/12/81 U. S. NUCLE AR REGULATORY COMMISSION LICENSEE EVENT REPORT o
bCONTROL8tOCK;l l l l l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) lo ltlatl >Al LlLICENSEE B l RlCODE Fl 1 l@l 01$ l 0 l- l 0 l 0LICENSE le l 0 lNUMBER 0 l 0 l- l 0 l 0 l@l 25 426 l 1 LICENSE l 1 l 1TYPE l 1JOl@l 57 CAT l 58 l@ l CON'T CL I1.J [,n"C l60L @l610 l 5 l 00CKET 0 l 0NUMBER l012 l 5 l 968 @l69 015EVENT lo l1 l 811 74l@l75016REPORT l 0 ] DATE 5 l 8 l180l@
/ 3 DATE EVENT DESCRl* TION AND PROBABLE CONSEQUENCES h l o l 2 l l During post-modification tests on a new sprinkler system. the fire oumo automatic I go l3; l start logic was found inoperable. T.S. 3.11..A.l.b requires operable logic. One fire I
.[ o l 4 ; Ipump was running at the time the inoperability was discovered. The pump was kept l I
io ls; l running while the automatic-start circuit was repaired. Manual start capability ]
Io is ] lwas operable. Units 1, 2, and 3 were affected. There was no danster to the health l lolij jor safety of the public. There are no redundant systems. There were no previous I iojg; lsimilar events. I i a9 80 JYSTEM CAUSE CAUSE COMP. VALV E CODE CODE SUSCODE COMPONENT CODE SUSCODE SU8 CODE mp el i A l B10 l@ l A l@ l X l @ l Z ] Z l Z l Z l Z l Z l@ [Z_J @ [Z_l 9 11 12 13 18 19 20
_ SEQUEN TI AL OCCURRENCE REPORT REVISION LERiRO EVENT YE4R REPORT No. CODE TYPE N O.
@ aEPORT l 8l 1l l_l l 0l 1l 6l l/l l0l1l l Tl l-l [1]
21 22 23 24 26 27 28 29 30 31 32 TAK N AC O O PLANT MET HOURS 22 S8 i FOR 8. SUPPL E MANUFAC RER lCl@l_Zj@ lZ l@ l36 Zl@ l 0l 0l 0l 37 l W@
43 l N lg l43Z l@ l44Z l 9 ] 9 l 947 [@
JJ J4 JS 40 42 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS lijoll Wiring was removed from terminal points in main relay panel 52, interrupting power to I g,i,j l fire pump auto-start circuit, probably while performing a modification in the canel. I
,,,,,g P ermanent wire was replaced immediately. Workplan was revised to caution electriciansI g lco consult with cognizant engineer prior to removing existing wiring. [
li t il i l i 8 9 80 T1 s TPOWER OTHE A STATUS 015 y RY DISCOVERY DESCRIPTION W [Z_j @ l Ol Ol 0lhl NA l l,C.,_l@l Soecin1 test l A T:VirY CO TENT AELE ASED OF RELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE W lZl@ W @l t g 9 10 13 NA 44 l l 45 NA 80 l
PERSONNEL F APOSURES t NOPeR E R TYPE DESCRIPTION ^
l li l il"10 l 010 l@l '
Zi@l
NA l
- PE nSO~~E'L IN;U'JiES
! NuMnER oESCRiPnON@
l NA 1
i M
! O l 0 l 011 l(Jl12
't 80 l
t O';5 OF OR OAMAGE TO FACILlTY TYPE O f SCnt PTION *
W lZl@l i 4 1 TO NA 80 l
e tsuPfifjN NhC USE ONLY ,
e " e;;ui81 LN_ NA l lllllllll[]llj l
t 4 1 to 68 69 80 ;
o S
NAME OF PREP ARER PHONE:
l 8106090 W
o.
~ Tcnnessee Valley Authority Form BF-17 Browns Ferry Nuclear Plant BF 15.2 3/24/81 LER SUPPLEMENTAL INFORMATION BFRO 259 / 81016 R1 Technical Specification Involved 3.11.A.l.b Reported Under Technical Specification 6.7.2.a(2)
Date of Occurrence 5/8/81 Time of Occurrence 1550 Unit 1, 2, and 3 Identification and Description of Occurrence:
Power (120V AC preferred) lifted to fire pump auto-initiation. The exact duration the circuit had been inoperable could not be determined. However, it is probable that the wiring was removed during the modification activity, making the duration 2 weeks ur less.
Conditions Prior to Occurrence:
Unit 1 refueling outage.
Unit 2 at 99%.
Unit 3 at 100%.
Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment. Describe.
Reterminated power supply.
Apparent Cause of Occurrence:
Wiring was removed from terminal points in main relay panel 52 resulting in the interruption of power to the fire pump auto-start circuit. Although it could not definitely be determined how the wiring was removed, it is suspected that the wires were removed during performance of a molification in tne panel.
Analysis of Occurrence:
There was no danger to the health or safety of the public, no release of activity, no damage to the plant or equipment, and n) resulting significant chain of events.
I -
l Corrective Action:
l ~
Replaced permanent wiring immediately. Precautions have been added to the l workplan requiring the electricians to consu'; the cognizanc engineer prior to removing any existing wiring.
I l
Failure Data:
Notic
(
j
- Retention . Period - Lifetime; Responsibility - Document Control Supervisor
- Revision: -
/
s l
i I