ML20004F067

From kanterella
Revision as of 14:43, 29 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1981
ML20004F067
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/10/1981
From: Clayton F
ALABAMA POWER CO.
To: Clayton F
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20004F068 List:
References
NUDOCS 8106160462
Download: ML20004F067 (1)


Text

Mailing Address Alabama P wer Company

'.

  • 600 North 18th Street Post Offica Box 2641 Darmingham. Alaoima 35291 Telephone 205 733-6081 F. L Clayton, Jr.

~

M,b 274;;;;;lfl"' -

AlabamaPower thesoumem e'ec:ncsnem

. June 10, 1981 -.

e.

Docket No. 50-348 &  %

h 0)

S' N hJ6 L1 .

Director, Office of Management Information and Program Control Ei JUN 151981 > 3 -

t-U. S. Nuclear Regulatory Commission  %.u.s. g g y m 7 Washington, D.C. 20555 $., , , J/

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the Hay, 1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6

- of the Appendix A Technical Specifications. As requested by letter from Mr.

John F. Stolz to Mr. Alan R. Barton, dated Cetober 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, f$n >

F.L.Clayton,[Jr.

FLCJr/JRC:nac l

Attachments xc: Mr. Ted Cintula (1 copy) 6 10 copies)

Director, RII (1 copy) i ws s

/[

lh 1

810616n{UQ\