ML20009C265
| ML20009C265 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/13/1981 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML20009C256 | List: |
| References | |
| NUDOCS 8107200418 | |
| Download: ML20009C265 (1) | |
Text
l o . I 1
l l
CONSUMERS POWER COMPANY I APPLICATION FOR REACTOR CONSTRUCTION PERMIT AND OPERATING LICENSE DOCKET NO 50-329 l DOCKET NO 50-330 l AMENDMENT NO 92 Enclosed herewith, revising and supplemen'.ing the above-entitled application, l
are revised pages for incorporation in the. Final Safety Analysis Report. The Final Safety Analysis Report was submitted with Amendment 33 to the above dockett on November 18, 1977. The enclosed material consists of the following-I
- 1. Completely revised and reformated FSAR Appendix 9A, Fire Protection l Evaluation Report.
- 2. Inclusion of a shutdown analysis section in the Fire Protection Evaluation l Report. !
l
- 3. Inclusion of a significantly expanied and reformated area fire analysis in ,
the Fire Protection Evaluation Report. l
- 4. Update of the responses to Appendix A of BTP APCSB 9.5-1 to reflect more l recent regulatory guidance.
These new and revised pages bear the notation " Revision 35 7/81," and are o marked in the margin to indicate where changes have been made. Additional (y) f pages and figures have been added as reflected on the revised Midland Plant FSAR " List of Effective Pages."
Consumera Power Company Dated July 13, 1981 By mes W Cook, Vice President Sworn and subscribed to before n-t on this 13th day of July 1981.
L -
Nota'ry Public, Jackson' County, Mic an My Commission Expires September 8, 198i
__,,,o. -- --
8107200418 810714 DR ADOCK 05000
F DISTRIBUTION AND ACKNOWLEDGEMENT FORM Bechtel Associates Professional Corporation TO NRC RETURN TO:
(D. Hood) BECHTEL ASSOCIATES HOLDER OF FSAR SET NUMBER 89 PROFESSIONAL CORPORATION P.O. r,0X 1000 REVISION NUMBER 35 ANN .RbOR, MICHIGAN 48106 SUBJECT DISTRIBUTION AND ACKNOWLEDGEMENT Attention: Linda Hultquist Job 7220-FSAR The enclcsed material is considered part of a controlled Midland Plant FSAR.
Revisions should be incorporated in the FSAR by following the collating in-structions attached to the revision. If any revision material is missing, please indicate in the space provided below. The holder of the FSAR is held responsible for the upkeep of their volumes.
In order to verify receipt of the enclosed information, please sign t'..e ac-knowledgement below and return the entire form within 30 days to me at the above location.
If you have transferred your assigned set (s), please indicate in the space below the set number (s), party (ies) and mailing address (es) so that further material can be sent directly to the new set holder (s).
Set Nunt>er(s)
Name of Party (ies)
Address (es) l The following material was missing from the revision (s):
REV. NO. PAGE NO. TABLE NO. FIGURE NO. tab I hereby certify that I have received the material, except as noted.
Signature of Set Holder Date
.