ML18139B818

From kanterella
Revision as of 10:42, 25 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits nine-month Response to NRC 801222 Ltr Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also Forwards Bechtel Nine-Month Response to NRC Ltr Dtd 801222 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.
Date released: 12/10/2018 Download: ML18139B818


Nine-Month Response to NRC Ltr Dtd 801220 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.
ML18139B819
Person / Time
Site: 05000000
Issue date: 03/31/1982
From:
BECHTEL GROUP, INC.
To:
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, TASK-A-36, TASK-OR
Download: ML18139B819 (61)
Submits nine-month Response to NRC 801222 Ltr Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Also Forwards Bechtel Nine-Month Response to NRC Ltr Dtd 801222 on Control of Heavy Loads for VEPCO North Anna Units 1 & 2.
ML18139B817
Person / Time
Site: 05000000
Issue date: 03/22/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR
Download: ML18139B817 (32)