ML19249E798

From kanterella
Revision as of 19:57, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-091/03L-0
Date released: 09/20/2019 Download: ML19249E798


LER 79-091/03L-0:on 790901,steam Generator 2 Low Level Trip Occurred on Steam & Feedwater Rupture Control Sys Channel 3.Caused by Inoperable Optical Isolator in Faulty Input Buffer Card.Board Was Replaced & New Buffer Card Installed
ML19249E800
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1979
From: Nelson J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19249E800 (2)
Forwards LER 79-091/03L-0
ML19249E797
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19249E797 (1)