ML19253A847

From kanterella
Revision as of 20:02, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-034/03L-0
Date released: 09/24/2019 Download: ML19253A847


LER 79-034/03L-0:on 790824,determined That Functional Surveillance Test Had Not Been Performed on Certain Seismic Monitoring Instrumentation within Specified Time.Caused by Personnel Error.Proper Procedure re-emphasized
ML19253A850
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/06/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A850 (1)
Forwards LER 79-034/03L-0
ML19253A846
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/06/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19253A846 (1)