ML19256G080

From kanterella
Revision as of 16:15, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-114/03L-0
Date released: 09/27/2019 Download: ML19256G080


LER 79-114/03L-0:on 791122,RCS Indicated Flow Below Tech Spec Requirements.Cause Undetermined.Flow Transmitter Signal Output Circuits Operating Normally.Actual RCS Flow & Transmitter Calibr Will Be Checked & Tubing Backfilled
ML19256G081
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1979
From: Werner J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G081 (3)
Forwards LER 79-114/03L-0
ML19256G079
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G079 (1)