ML19256G196

From kanterella
Revision as of 17:06, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-113/03L-0
Date released: 09/27/2019 Download: ML19256G196


LER 79-113/03L-0:on 791121,hourly Surveillance Requirements Not Performed for 5.5-h While Incore Instrumentation Was Inoperable.Caused by Procedural Deficiency.Equipment Status Board Not Updated.Procedure Pp 1102.02 Revised
ML19256G198
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/18/1979
From: David Brown
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G198 (2)
Forwards LER 79-113/03L-0
ML19256G195
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/18/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19256G195 (1)