ML19257A180

From kanterella
Revision as of 16:55, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-119/03L-0
Date released: 09/28/2019 Download: ML19257A180


LER 79-119/03L-0:on 791203,post-accident Radiation Monitors Could Have Had High Setpoint for Release Set Higher than Allowed by Tech Specs.Caused by Procedural Deficiency. Procedure Mods Prepared
ML19257A182
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/1979
From: Scott R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257A182 (2)
Forwards LER 79-119/03L-0
ML19257A179
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19257A179 (1)