ML19259B789

From kanterella
Revision as of 15:21, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-029/01T-0
Date released: 09/30/2019 Download: ML19259B789


LER 79-029/01T-0 on 790306:during Valve Lineup,Auxiliary Operator Mistakenly Closed Borated Water Storage Tank Isolation Valves DH7A & DH7B.Caused by Personnel Error. Valves Opened Immediately
ML19259B790
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/16/1979
From: David Brown
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-98
Download: ML19259B790 (3)
Forwards LER 79-029/01T-0
ML19259B788
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/16/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-98
Download: ML19259B788 (1)