ML19270F522

From kanterella
Revision as of 09:18, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-009/03L-0
Date released: 10/11/2019 Download: ML19270F522


LER 79-009/03L-0:on 790112,power to Vital Bus Y2 Lost. False Integrated Control Sys Signal Resulted in Reactor & Full Steam & Feedwater Rupture Control Sys Trip.Caused by Blown 125 Volt DC Fuse to Inverter
ML19270F527
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/08/1979
From: Lingenfelter J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19270F527 (3)
Forwards LER 79-009/03L-0
ML19270F521
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/09/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FOIA-79-149
Download: ML19270F521 (1)