ML19282B807

From kanterella
Revision as of 06:15, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 79-025/03L-0
Date released: 10/23/2019 Download: ML19282B807


LER 79-025/03L-0 on 790213:Ohio Edison Relay Testing Actuated Transfer Trip Receiving Relay & Tripped Switchyard Breakers.Caused by Failure of Util to Notify Toledo Edison Before Performing Relay Testing
ML19282B808
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/1979
From: Dibert D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B808 (3)
Forwards LER 79-025/03L-0
ML19282B806
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/12/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B806 (1)