ML19305A101

From kanterella
Revision as of 11:05, 20 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Deficiency Report Re Upper Head Injection Sys Rate
Date released: 11/15/2019 Download: ML19305A101


Final Deficiency Report:During Preoperational Test of Upper Head Injection Sys,Accumulators Injected Water in Excess of Design Allowables for LOCA Simulation.Standpipes Have Been Removed & Corrected
ML19305A108
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/28/1978
From:
TENNESSEE VALLEY AUTHORITY
To:
References
FOIA-79-149
Download: ML19305A108 (2)
Forwards Final Deficiency Report Re Upper Head Injection Sys Rate
ML19305A100
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 12/28/1978
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
FOIA-79-149
Download: ML19305A100 (1)