ML19309A969

From kanterella
Revision as of 05:36, 20 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-025/03L-0
Date released: 11/19/2019 Download: ML19309A969


LER 80-025/03L-0:on 800308,during Shutdown,While Performing Rhr(Lpci) Pump Start Timers Calibr,Relay 2E11-K75A Setpoint Exceeded Tech Specs.Caused by Setpoint Drift.Relay Recalibr
ML19309A975
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/25/1980
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309A975 (2)
Forwards LER 80-025/03L-0
ML19309A968
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/25/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19309A968 (1)