ML19318A909

From kanterella
Revision as of 16:32, 19 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 80-034/03L-0 & 80-035/03L-0
Date released: 11/28/2019 Download: ML19318A909


LER 80-035/03L-0:on 800519,diesel Generator 2C Would Not auto-start & Was Declared Inoperable.Caused by Switch Being Inadvertently Placed in Run Position Rather than Auto Position.Switch Placed in Auto
ML19318A915
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/18/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318A915 (2)
LER 80-034/03L-0:on 800519,diesel Generator 1C Was Declared Inoperable When Generator Failed to Reach Rated Speed within Time Specified by Tech Spec.Probably Caused by Leaky Check Valve in Fuel Oil Sys.Valve Replaced
ML19318A914
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/17/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318A914 (1)
Forwards LERs 80-034/03L-0 & 80-035/03L-0
ML19318A908
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/17/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19318A908 (1)