ML19318C399

From kanterella
Revision as of 15:28, 19 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-043/03L-0
Date released: 11/28/2019 Download: ML19318C399


LER 80-043/03L-0:on 800528,while Testing Safety Features Actuation Sys,Valve DH-11 Closed & Dh Pump 1-1 Was Stopped. Caused by Procedural Inadequacy.Responsible Personnel Were Made Aware of Problem
ML19318C407
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/26/1980
From: Isley T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19318C407 (3)
Forwards LER 80-043/03L-0
ML19318C398
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/26/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19318C398 (1)