ML19325D157

From kanterella
Revision as of 23:44, 18 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 88-025-01 & 89-026-00
Date released: 12/05/2019 Download: ML19325D157


LER 89-026-00:on 890913,reactor Thermal Power Level Exceeded That Specified in OL Due to Unexpected Recirculation Sys Flow Control Transient.Caused by Component Failure.Failed Isolation Solenoid Valve Replaced
ML19325D159
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/13/1989
From: Dunn G
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
References
Download: ML19325D159 (3)
LER 88-025-01:on 880618,reactor Protection Sys (RPS) Bus Inadvertently Deenergized,Resulting in Full RPS Actuation. Caused by Personnel Error W/Contributing Factor of Poor Human Factors Design.Info Tag Installed on Power Switch
ML19325D158
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/13/1989
From: Dunn G
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
References
Download: ML19325D158 (3)
Forwards LERs 88-025-01 & 89-026-00
ML19325D156
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/13/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML19325D156 (1)