ML19329B563

From kanterella
Revision as of 15:47, 18 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER NP-09-77-02
Date released: 12/09/2019 Download: ML19329B563


RO NP-09-77-02:on 770830,during Surveillance Test,Personnel Discovered That Weekly Gaseous Grab Sample from Station Vent Monitor Was Not Obtained.Caused by Component Failure. Stack Radiation Monitor Returned to Svc
ML19329B652
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1977
From:
TOLEDO EDISON CO.
To:
References
Download: ML19329B652 (1)
Forwards LER NP-09-77-02
ML19329B562
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/26/1977
From: Jonathan Evans
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19329B562 (1)