ML19350C792

From kanterella
Revision as of 04:30, 16 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests to Defer Consideration of Seismic Issues Until OL proceeding.Site-specific Seismic Review Is Not Ripe for Adjudication & Waiting for Seismic Issues Resolution Will Result in Significant Delays
Date released: 12/30/2019 Download: ML19350C792


Requests to Defer Consideration of Seismic Issues Until OL proceeding.Site-specific Seismic Review Is Not Ripe for Adjudication & Waiting for Seismic Issues Resolution Will Result in Significant Delays
ML19350C807
Person / Time
Site: Midland
Issue date: 03/06/1981
From: Thiruvengadam
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19350C807 (10)
Requests to Defer Consideration of Seismic Issues Until OL proceeding.Site-specific Seismic Review Is Not Ripe for Adjudication & Waiting for Seismic Issues Resolution Will Result in Significant Delays
ML19350C798
Person / Time
Site: Midland
Issue date: 03/16/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML19350C798 (4)
Requests to Defer Consideration of Seismic Issues Until OL proceeding.Site-specific Seismic Review Is Not Ripe for Adjudication & Waiting for Seismic Issues Resolution Will Result in Significant Delays
ML19350C791
Person / Time
Site: Midland
Issue date: 03/18/1981
From: Steptoe P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), ISHAM, LINCOLN & BEALE
To:
Atomic Safety and Licensing Board Panel
References
Download: ML19350C791 (10)