D['S-BESSE NUCIEAR PCiER STATICN Report of Shipping Da= age to Centain=ent Vessel Equipment Hatch.
d
Background
The contain=ent vessel for the Davis-Besse Station is being fabricated and field-erected by the Chicago Bridge & Iron Cc=pany and is in final stages of erection.
.
The 13-foot dia=eter equipment hatch for this structure had been shipped to the job site en April 11, 1972. After shipment, a routine internal CE&I shop audit disclosed that velded attach =ents had been attached after stress reliev-ing, which required further tress relieving.
--On-May 2h,1972, this equipment hatch was shipped from the site to the Chicago plant for stress relieving in the shop facilities.
Incident -
on May 28 or 29, 1972, while the shipping ' car was on the Penn Central Railroad at Elkhart, Indiana, the shipping car was hu= ped sufficiently to damage the equipment hatch. Upen arrival at the C3&I Chicago plant, inspection revealed
. damage to the' extent that repair vould be necessa:/.
Inspection and Renair
- A complete inspection and repair procedure with results of da= age was sub=itted under date of. June e, 1972, and approved en June 9, 1972.
be danage consisted of two dented-in areas of the dished decr head. The ene
.
tire head was cleaned of paint, the veld sea =s and attach =ent velds were sand-blasted and magnetic pe.rticle tested.
'
.
e
.
.
8002060 g
__ -_
_ -
Te center portion of thwdoor head containing the two de".ed areas was cut
,
out and replaced with a new dished center plate.
4 i The entire equipment hatch assembly was then st ess relieved, final inspected, and finished for shipment.
. .
The inspection, repair, and stress relieving was completed and the hatch assembly re-shipped to the job site on June lh, 1972. Installation of the hatch assembly in t* ne centainment vessel commenced on June 26, 1972, and is essentially cc=plete.
Summary The shipping damage to the containment vessel equipment hatch was inspected and
- j. repaired using detailed approved precedures in the nanufacturer's plant and the hatch meets all requirements of the codes and specifications under which it was manufactured.
I
.
4 o
..
.
F
-August 3, 1972 l
'
!
.- - .