ENS 53142
ENS Event | |
---|---|
13:17 Dec 30, 2017 | |
Title | Technical Specification Required Report For An Abnormal Occurrence |
Event Description | On 12/30/17 at 0717 CST, the University of Missouri-Columbia Research Reactor (MURR) was shut down due to the loss of negative pressure in the reactor containment building. Prior to the shutdown, the reactor was operating for a period of time during the loss of negative pressure which is a deviation from MURR Technical Specifications (TS). This email is a required notification per TS 6.6.c.(1) to report to the NRC Operations Center that an Abnormal Occurrence, as defined by MURR TS 1.1, had occurred. Specifically, MURR was not in compliance with all TS Limiting Conditions for Operations (LCOs). MURR was not in compliance with TS's 3.4.b and 3.4.a.(6).
TS 3.4.b. states, 'Reactor containment integrity shall be maintained at all times except when: (1) The reactor is secured...' TS. 3.4.a.(6) states, 'For reactor containment integrity to exist, the following conditions shall be satisfied:...(6) The reactor containment building is at a negative pressure of at least 0.25 inches of water with respect to the surrounding areas: and...' While on Routine Patrol on the morning of 12/30/17, an operator noted that the differential pressure gauge between the reactor containment building and the MURR laboratory building was reading zero (0.0) inches of water vacuum. The operator on Routine Patrol radioed the Lead Senior Reactor Operator in the Control Room, and the reactor was shut down. The cause of the loss of negative pressure was the closing of a backup ventilation exhaust door from the reactor containment building. With the backup ventilation exhaust door closed, the ventilation system was only supplying air to the reactor containment building, not allowing a balanced air recirculation to maintain a negative pressure. The backup ventilation exhaust door actuator was found to be inoperable. The backup ventilation exhaust door operation was repaired by melting ice that had formed in the air supply lines to the door's operating air cylinder. Condensation that had formed in the air lines was removed, and heat trace and insulation were installed around all the backup door air supply lines. The compliance procedure for verifying backup ventilation doors' operability was conducted satisfactorily as post-maintenance testing. Permission from the Interim Facility Director was obtained prior to the reactor returning to operation later on 12/30/17. A detailed event report will follow within 14 days as required by MURR TS 6.6.c.(3). |
Where | |
---|---|
Univ Of Missouri-Columbia Columbia, Missouri (NRC Region 0) | |
License number: | R-103 |
Reporting | |
Non | |
Time - Person (Reporting Time:+71.98 h2.999 days <br />0.428 weeks <br />0.0986 months <br />) | |
Opened: | Bruce Meffert 13:16 Jan 2, 2018 |
NRC Officer: | Bethany Cecere |
Last Updated: | Jan 2, 2018 |
53142 - NRC Website | |
Univ Of Missouri-Columbia with Non | |
WEEKMONTHYEARENS 553802021-07-26T22:31:00026 July 2021 22:31:00
[Table view]Non Reactor Shutdown Due to Control Rod Drive Failure ENS 546602020-04-09T19:32:0009 April 2020 19:32:00 Non Abnormal Occurrence ENS 546532020-04-08T06:00:0008 April 2020 06:00:00 Non Research and Test Reactor Forced Shutdown Due to Failure of Regulating Blade Drive Mechanism ENS 544532019-12-20T03:21:00020 December 2019 03:21:00 Non Technical Specification Deviation ENS 544362019-12-10T06:12:00010 December 2019 06:12:00 Non Technical Specification Violation Requiring Shutdown ENS 541872019-07-30T00:03:00030 July 2019 00:03:00 Non Technical Specification Deviation ENS 540342019-04-28T11:33:00028 April 2019 11:33:00 Non Control Blade Inoperable ENS 538492019-01-28T01:13:00028 January 2019 01:13:00 Non Control Blade Inoperable ENS 538412019-01-21T18:35:00021 January 2019 18:35:00 Non Deviation of Ts 3.3.A(1) for Anti-Siphon Device Found Inoperable ENS 534332018-05-30T12:10:00030 May 2018 12:10:00 Non Technical Specification Deviation ENS 532442018-03-04T09:08:0004 March 2018 09:08:00 Non Technical Specification Deviation ENS 531422017-12-30T13:17:00030 December 2017 13:17:00 Non Technical Specification Required Report for an Abnormal Occurrence ENS 528412017-07-05T05:00:0005 July 2017 05:00:00 Non Abnormal Occurrence Due to Source Range Inoperability During Reactor Start-Up ENS 527022017-04-20T19:49:00020 April 2017 19:49:00 Non Technical Specification Required Report for an Abnormal Occurrence 2021-07-26T22:31:00 | |