LR-N05-0255, Steam Generator Tube Plugging Report
| ML051440377 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 05/09/2005 |
| From: | Perino C Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N05-0255 | |
| Download: ML051440377 (2) | |
Text
- IPSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 MAY 0 9 2005 LR-N05-0255 o PSEG N~uclear LLC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 STEAM GENERATOR TUBE PLUGGING REPORT TECHNICAL SPECIFICATION 4.4.6.5.A SALEM GENERATING STATION UNIT NO. 2 FACILITY OPERATING LICENSE DPR-75 DOCKET NO. 50-311 PSEG Nuclear, LLC (PSEG) hereby submits the steam generator tube plugging report for Salem Unit No. 2 as required by Technical Specification 4.4.6.5.a for Facility Operating License DPR-75. The steam generator tube in-service inspections were completed on April 25, 2005, during the Unit 2, fourteenth refueling outage.
The following is a summary of the tubes plugged during 2R14 as a result of eddy current inspections:
Tubes Plugged Total Tubes % Tubes in 2R14 Plugged Plugged Steam Generator #21 - 26 250 7.38 Steam Generator #22 - 14 249 7.35 Steam Generator #23 - 6 239 7.05 Steam Generator #24 - 32 362 10.68 Salem Unit No. 2 steam generator total tube plugging average is 8.12%.
If you have any questions or require additional information, please contact Mr.
Michael Mosier at (856) 339-5434.
Sincerely, Christina L. Perino Regulatory Assurance - Director 4N OD I 95-2168 REV. 7199
_ _ >a Document Control Desk 2 0 92 LR-N05-0255 MAY 005 C Mr. S. Collins, Administrator- Region I U.S. Nuclear Regulatory Commission 475 Allendale Rd.
King of Prussia, PA 19406 Mr. D. Collins, Project Manager- Hope Creek/Salem U.S. Nuclear Regulatory Commission Mail Stop 08C2 Washington, DC 20555-0001 USNRC Senior Resident Inspector Salem (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering P.O. Box 415 Trenton, NJ 08625