NRC-07-0035, Response to Request for Additional Information Regarding License Amendment Request for Extension of Completion Time for an Inoperable Emergency Diesel Generator

From kanterella
Revision as of 05:02, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Response to Request for Additional Information Regarding License Amendment Request for Extension of Completion Time for an Inoperable Emergency Diesel Generator
ML071780090
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/20/2007
From: Plona J
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-07-0035
Download: ML071780090 (6)


Text

Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734. 586.5910 Fax: 734..586.4172 Detroit Edison A DTEEnergy Company June 20, 2007 10 CFR 50.90 NRC-07-0035 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) Detroit Edison Letter to NRC, "Proposed License Amendment Request to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Emergency Diesel Generator," NRC-06-0040, dated July 12, 2006
3) NRC letter dated June 13, 2007, "Fermi Unit 2 - Request for Additional Information Regarding Proposed License Amendment to Extend the Completion Time for Technical Specification 3.8.1 for an Inoperable Diesel Generator"

Subject:

Response to Request for Additional Information Regarding License Amendment Request for Extension of Completion Time for an Inoperable Emergency Diesel Generator In Reference 2, Detroit Edison requested NRC approval of a proposed license amendment that requests an extension of the completion time for Fermi 2 Emergency Diesel Generators (EDGs) from 7 to 14 days.

In a June 8, 2007 telephone call, the NRC indicated that a followup request for additional information (RAI) would be issued to request reliability and availability information for Combustion Turbine Generator Units 11-1, 11-2, 11-3, and 11-4. Reference 3 was subsequently issued requesting this information. Enclosure 1 provides the requested information.

The supplemental information provided in this letter does not impact the conclusions of the Determination of No Significant Hazards Consideration and Environmental Assessment presented in the July 12, 2006 submittal (Reference 2). D

USNRC NRC-07-0035.

June 20, 2007 Page 2 There are no new regulatory commitments associated with this letter.

If you have any questions regarding this submittal, please contact Ronald W. Gaston at (734) 586-5197.

Sincerely,

Enclosures:

1. Response to Request for Additional Information cc: NRC Project Manager Reactor Projects Chief, Branch 4, Region III NRC Resident Office Regional Administrator, Region III Supervisor, Electric Operators, Michigan.Public Service Commission

USNRC NRC-07-0035 June 20, 2007 Page 3 I, Joseph H. Plona, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

J. 1H. 'lona Site Vice President Nuclear Generation On this day of \Jt..,, ,2007 before me personally appeared Joseph H. Plona, being first duly sworn and says that he executed the foregoing as his free act and deed.

STXY CAKES -

wCTAIWyPu13UC.TATE 01 M COUIMTOF MORCE MYcMGMSO EXPIRES Jul 45 2C42 AZ11NG INCOUNTYOF nu"94G ,At Noty Pubk-

__ ENCLOSURE i1to.

NRC-07-0035 FERMI 2 NUCLEAR POWER PLANT Response to Request for Additional Information

NRC-07-0035 Page 2 RAI Provide reliability and availability of all the combustion turbine generators (CTG 11 Units).

RAI Response The reliability and availability of the CTGs are monitored under the MR program. If the pre-established reliability or availability performance criteria are not achieved for the CTGs, they are considered for 10 CFR 50.65 (a)(1). actions. These actions. would require increased management attention and goal setting in order to restore their performance to an acceptable level. The actual out of service time for the CTGs is minimized to ensure that the reliability and availability performance criteria are met. CTGs hours are tracked in Operational Modes 1, 2, and 3.

CTG 11-1 Availability and Out of Service (OOS) Hours Year CTG 11-1 Yearly Availability (%) CTG 11-1 OOS Hours 2003 38.86* 4761.54 2004 97.53 198.02 2005 98.83 94.65 2006 90.21 722.93

  • Failure to start in August 2003 required recording fault exposure hours from the time an inverter circuit card with an incorrect setpoint was installed, in August 2001.

CTG 11-1 Reliability Fermi 2 collects Combustion Turbine Generator (CTG) Unit 11-1 reliability data as part of our Maintenance Rule program. The 36 month rolling average start probability was multiplied by the probability to run to determine the overall reliability for each month of 2003 through 2006.

CTG 11-1 reliability from January 1, 2003 until December 31, 2006, ranged from 91.10%

in December 2003 to 98.31% in December 2006. The average reliability was 94.01%.

CTG 11-2, 11-3, 11-4 Availability and Reliability CTG Units 11-2, 11-3, and 11-4 have been in the scope of the plant's implementation of the maintenance rule since January 24, 2006.

.'Enclosure 1 .to NRC-07-0035 Page 3

.CTG 11-2, 11-3, 4l4 Availability and Out of Service:(OOS) UHours Year CTG 11-2,Yeafly CTG 11-3 Yearly CTG 1-4'Yeari.y CTG11I-2, 3,4 Availability{(%) Availability.(%) Availability(°/1-) Cumulative OOS Hours 2003 97.33 96.73 96.40 742.79 2004 94.91 90.15 92:42 1806.01 2005 95.23 92.17 79.58 2674.43 2006 97:04 92.99 87..14 1684:63 CTG 11-2, 11-3, 11-4 -Reliability CTG Functional Failures (FF) are monitored monthly for reliability data. Functional Failures are failures :to start when demanded. Typically, CTG 11-2, 11-3, and 11-4 are run monthly per the Performance Scheduling and Tracking program. Other starts occur as a result of preventative maintenance, corrective maintenance, or as required by the Central System Supervisor.

Functional Failure Data for CTG 11-2, 11-3, and 11-4 Performance Criteria: Performance Criteria:

< 15 Functional < 15 Functional.

Monthly Failures cumulative Monthly Failures cumulative Month FFs per 12 Months Month FFs per 12 Months Jan-05 I

  • Jan-06 0 6 Feb-05 I
  • Feb-06 0 5 Mar-05 0
  • Mar-06 0 5 Apr-05 0
  • Apr-06 0 5 May-05 0
  • May-06 0 5 Jun-05 0
  • Jun-06. .1 6 Jul-05 1
  • Jul-06 0 5 Aug-05 2
  • Aug-06 3 6 Sep-05 2
  • Sep-06 -0 4
  • Oct-05 0
  • Oct-06 0 4 Nov-05 0
  • Nov-06 0 4 Dec-05 0 7 Dec-06 1 5
  • 12 month cumulative ;FF tracking startedin January 2006.