L-2008-159, Duane Arnold, and Point Beach Units 1 and 2 - Response to NRC Request for Additional Information Concerning NRC Bulletin 2007-01: Security Officer Attentiveness

From kanterella
Revision as of 13:50, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Duane Arnold, and Point Beach Units 1 and 2 - Response to NRC Request for Additional Information Concerning NRC Bulletin 2007-01: Security Officer Attentiveness
ML082320061
Person / Time
Site: Saint Lucie, Point Beach, Seabrook, Turkey Point, Duane Arnold  NextEra Energy icon.png
Issue date: 08/15/2008
From: Stall J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-07-001, L-2008-159
Download: ML082320061 (2)


Text

Florida Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 Security Related Information WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 AUG 1"5-2008 L-2008-159 10 CFR 2.390 U.S. Nuclear Regulatory Commission 10 CFR 50.54(f)

Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 RE: Florida Power and Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 FPL Energy Seabrook, LLC SeabrookStation, Docket No. 50-443 FPL Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 FPL Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266 and 50-301 Response to NRC Request for Additional Information Concerning NRC Bulletin 2007-01: Security Officer Attentiveness By letter (L-2008-001) dated February 11, 2008, Florida Power & Light Company (FPL), the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4; FPL Energy Seabrook, LLC (FPL Energy Seabrook) the licensee for Seabrook Station; FPL Energy Duane Arnold, LLC (FPL Energy Duane Arnold) the licensee for Duane Arnold Energy Center; and FPL Energy Point Beach, LLC (FPL Energy Point Beach) the' licensee for Point Beach Nuclear Plant, Units 1 and 2, submitted the required written response to NRC Bulletin 2007-01, "Security Officer Attentiveness."

By letter dated July 1, 2008, the NRC staff requested additional information in order to complete their final assessment of FPL's response to the Security Bulletin. The NRC staff requested the additional information within 45 days of the date of their request (i.e., on or before August 15, 2008).

The purpose of this letter is to provide the additional information requested by the NRC staff. provides the requested information for St. Lucie Units 1 and 2. Attachment 2 provides the requested information for Turkey Point Units 3 and 4. Attachment 3 provides the requested information for FPL Energy Seabrook Station. Attachment 4 provides the requested information for FPL Energy Duane Arnold. Attachment 5 provides the requested information for FPL Energy Point Beach Units 1 and 2.

The attachments to this letter contain security related information. Therefore, the attachments are exempt from public disclosure in accordance with 10 CFR 2.390 and are marked (Attachments contain Security Related Information. Upon separation this page is decontrolled.)

an FPL Group company/* a3n 2p j

L-2008-159 Page 2 Security Related Information WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 accordingly. Please limit distribution of the attachments and ensure that the attachments are not placed in the NRC Public Document Room.

Please note that policies and practices identified here are subject to change based upon FPL and/or industry operating experience and should not be expected to remain static over time.

No new commitments and no changes to previous commitments are made in this submittal.

If you have any questions or require additional information, please contact Gerald Mocello at (561) 691-7416.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on j/*-*/

Sincerely yours, J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Attachments: 1. Additional St. Lucie Units 1 and 2 Information Concerning NRC Bulletin 2007-01 - Exempt from Public Disclosure in accordance with 10 CFR 2.390

2. Additional Turkey Point Units 3 and 4 Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
3. Additional Seabrook Station Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
4. Additional Duane Arnold Energy Center Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
5. Additional Point Beach Units 1 and 2 Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390 cc:

Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region III USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach (Attachments contain Security Related Information. Upon separation this page is decontrolled.)

Text

Florida Power & Light Company, 700 Universe Boulevard, P.O. Box 14000, Juno Beach, FL 33408-0420 Security Related Information WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 AUG 1"5-2008 L-2008-159 10 CFR 2.390 U.S. Nuclear Regulatory Commission 10 CFR 50.54(f)

Attn: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 RE: Florida Power and Light Company St. Lucie Units 1 and 2, Docket Nos. 50-335 and 50-389 Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251 FPL Energy Seabrook, LLC SeabrookStation, Docket No. 50-443 FPL Energy Duane Arnold, LLC Duane Arnold Energy Center, Docket No. 50-331 FPL Energy Point Beach, LLC Point Beach Units 1 and 2, Docket Nos. 50-266 and 50-301 Response to NRC Request for Additional Information Concerning NRC Bulletin 2007-01: Security Officer Attentiveness By letter (L-2008-001) dated February 11, 2008, Florida Power & Light Company (FPL), the licensee for the St. Lucie Nuclear Plant, Units 1 and 2, and the Turkey Point Nuclear Plant, Units 3 and 4; FPL Energy Seabrook, LLC (FPL Energy Seabrook) the licensee for Seabrook Station; FPL Energy Duane Arnold, LLC (FPL Energy Duane Arnold) the licensee for Duane Arnold Energy Center; and FPL Energy Point Beach, LLC (FPL Energy Point Beach) the' licensee for Point Beach Nuclear Plant, Units 1 and 2, submitted the required written response to NRC Bulletin 2007-01, "Security Officer Attentiveness."

By letter dated July 1, 2008, the NRC staff requested additional information in order to complete their final assessment of FPL's response to the Security Bulletin. The NRC staff requested the additional information within 45 days of the date of their request (i.e., on or before August 15, 2008).

The purpose of this letter is to provide the additional information requested by the NRC staff. provides the requested information for St. Lucie Units 1 and 2. Attachment 2 provides the requested information for Turkey Point Units 3 and 4. Attachment 3 provides the requested information for FPL Energy Seabrook Station. Attachment 4 provides the requested information for FPL Energy Duane Arnold. Attachment 5 provides the requested information for FPL Energy Point Beach Units 1 and 2.

The attachments to this letter contain security related information. Therefore, the attachments are exempt from public disclosure in accordance with 10 CFR 2.390 and are marked (Attachments contain Security Related Information. Upon separation this page is decontrolled.)

an FPL Group company/* a3n 2p j

L-2008-159 Page 2 Security Related Information WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 accordingly. Please limit distribution of the attachments and ensure that the attachments are not placed in the NRC Public Document Room.

Please note that policies and practices identified here are subject to change based upon FPL and/or industry operating experience and should not be expected to remain static over time.

No new commitments and no changes to previous commitments are made in this submittal.

If you have any questions or require additional information, please contact Gerald Mocello at (561) 691-7416.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on j/*-*/

Sincerely yours, J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Attachments: 1. Additional St. Lucie Units 1 and 2 Information Concerning NRC Bulletin 2007-01 - Exempt from Public Disclosure in accordance with 10 CFR 2.390

2. Additional Turkey Point Units 3 and 4 Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
3. Additional Seabrook Station Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
4. Additional Duane Arnold Energy Center Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390
5. Additional Point Beach Units 1 and 2 Information Concerning NRC Bulletin 2007 Exempt from Public Disclosure in accordance with 10 CFR 2.390 cc:

Regional Administrator, Region I Regional Administrator, Region II Regional Administrator, Region III USNRC Project Manager, Turkey Point and St. Lucie Senior Resident Inspector, USNRC, Turkey Point Senior Resident Inspector, USNRC, St. Lucie USNRC Project Manager, Seabrook Station Senior Resident Inspector, USNRC, Seabrook Station USNRC Project Manager, Duane Arnold Senior Resident Inspector, USNRC, Duane Arnold USNRC Project Manager, Point Beach Senior Resident Inspector, Point Beach (Attachments contain Security Related Information. Upon separation this page is decontrolled.)