NRC 2011-0051, Regulatory Commitment Change
| ML111290218 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/06/2011 |
| From: | Meyer L Point Beach |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC 2011-0051 | |
| Download: ML111290218 (1) | |
Text
I BEACH May 6,201 1 NRC 2011-0051 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units Iand 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Regulatorv Commitment Change
References:
FPL Energy Point Beach, LLC letter to NRC, dated April 7,2009, License Amendment Request 261, Extended Power Uprate (ML091250564)
Via Reference (I), NextEra made the following Regulatory Commitment:
The high pressurizer pressure reactor trip delay time of less than or equal to I.O second will be verified by a time delay test prior to operation of that unit at EPU conditions.
An engineering evaluation was performed. The evaluation determined response time testing of the high pressurizer pressure reactor trip instrument loops is not required because the trip will occur in less than 1.0 second, with a margin of 0.61 seconds.
The evaluation provided a basis for the elimination of the response time testing requirement using WCAP 13632, Elimination of Pressure Sensor Response Time Testing Requirements, and EPRl NP-7243, Investigation of Response Time Requirements. Accordingly, NextEra is closing this Regulatory Commitment with no further action.
If you have questions or require additional information, please contact Mr. James Costedio at 9201755-7427.
Very truly yours, Larry Meyer Site Vice President cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW NextEra Energy Point Beach, LLC,6610 Nuclear Road, Two Rivers, WI 54241