NRC Staff'S Status Update Letter March 29, 2013
ML13088A003
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/29/2013
From: Harris B
NRC/OGC
To: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 24302, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML13088A003 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 March 29, 2013 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012 and the Staff is currently expecting to publish the SER in July 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in May 2013 and the Final SEIS in November 2013.

Respectfully submitted,

/signed (electronically) by/

Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 Brian.harris@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the March 29, 2013 Letter from Brian G. Harris to the Board, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 29th day of March, 2013.

Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 Telephone: (301) 415-1392 E-mail: brian.harris@nrc.gov Date of Signature: March 29, 2013