|
---|
Category:E-Mail
MONTHYEARML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Station'S PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20090F5532020-03-30030 March 2020 NRR E-mail Capture - Accepted: Columbia Relief Request, EPID: L-2020-LLR-0035 2024-08-01
[Table view] |
Text
Craver, Patti From: Logan, Dennis Sent: Thursday, October 13, 2011 9:36 AM To: Krieg, Rebekah Cc: Doyle, Daniel
Subject:
FW: FW: Revised biological assessment conclusion for bull trout in Columbia Generating Station Section 7 consultation with FWS. NRC Docket 050-00397
- Becky, No need to respond to Dan. He and I talked this morning and went over what must be done. Thank you again for all your efforts on this project.
Dennis From: Doyle, Daniel Sent: Wednesday, October 12, 2011 5:08 PM To: Logan, Dennis; Krieg, Rebekah
Subject:
RE: FW: Revised biological assessment conclusion for bull trout in Columbia Generating Station Section 7 consultation with FWS. NRC Docket 050-00397 Dennis and Becky, Attached is the response from USFWS which I received today. They concur with our revised finding and include some language about conditions under which the project should be reanalyzed or consultation should be re-initiated.
Can you send Mr. Gauthier a brief email acknowledging the letter or should I do it?
Is there anything else we should do about this as we move into the final SEIS?
- Thanks, Dan Doyle Project Manager Division of License Renewal U.S. Nuclear Regulatory Commission daniel.doyle@nrc.gov (301) 415-3748 From: LukeGauthier@fws.gov [1]
Sent: Tuesday, October 04, 2011 10:53 AM To: Logan, Dennis Cc: Doyle, Daniel
Subject:
Re: FW: Revised biological assessment conclusion for bull trout in Columbia Generating Station Section 7 consultation with FWS. NRC Docket 050-00397 Dr. Logan, Thank you for sending this revision. I will review the information and send you a response as soon as possible.
1r
Luke S. Gauthier USFWS - Central Washington Field Office 215 Melody Lane, Suite 119 Wenatchee, WA 98801 509.665.3508 x24 (tel) 509.665.3509 (fax) www.fws.gov/wafwo "Logan, Dennis" <Dennis.Logan@nrc.gov> To 'LukeGauthier@fws.gov <Luke_Gauthier@fws.gov>
cc 09/29/2011 04:41 AM Subject FW: Revised biological assessment conclusion for bull trout in Columbia Generating Station Section 7 consultation with FWS. NRC Docket 050-00397 From: Logan, Dennis Sent: Wednesday, September 28, 2011 5:29 PM To: luke.gauthier@fws.gov Cc: Imboden, Andy; Doyle, Daniel; Balsam, Briana; Krieg, Rebekah; NRR-PMDA-ECapture Resource
Subject:
Revised biological assessment conclusion for bull trout in Columbia Generating Station Section 7 consultation with FWS.
NRC Docket 050-00397
Dear Mr. Gauthier:
The NRC staffs August 2011 biological assessment concluded that the continued operation of the Columbia Generating Station (CGS) would have no effect on the bull trout (Salvelinus confluentus). After further consideration, however, the NRC staff has revised its conclusion and now believes that operation of the CGS is not likely to adversely affect bull trout. The following discussion summarizes the findings of the biological assessment and presents the justification for the revised conclusion.
Proposed Action The NRC's Federal action is the decision whether to renew the CGS operating license for an additional 20 years.
CGS Water Withdrawal and Discharge Summary In generating electricity, CGS produces heat, which is transferred to the atmosphere through evaporation using six mechanical draft cooling towers. CGS also routinely discharges a portion of cooling water to the Columbia River. The total water losses are replaced by withdrawal from the Columbia River (replacement water is called make-up water). During normal operating periods, the average makeup-water withdrawal is about 17,000 gpm (1.1 m3/s). The plant withdraws water about 300 ft (91 m) from the shoreline through two intake screens that have an outer and inner perforated pipe sleeve to exclude adult fish. The outer sleeve has a 42-in.
(107-cm) -diameter sleeve with 3/8-in. (9.5-mm)-diameter holes (composing 40 percent of the surface area). The inner sleeve has a 36-in. (91-cm)-diameter sleeve with 3/4-in. (19-mm)-diameter holes (composing 7 percent of the surface area). For the discharge, the State of Washington authorizes discharge in accordance with the special and general conditions of National Pollutant Discharge Elimination System Permit No. WA-002515-1.
Assessment of Impacts to Bull Trout The FWS listed bull trout as threatened throughout their range in 1999. The CGS's action is the Hanford Reach, which lies within the Columbia River Distinct Population segment of bull trout. The FWS considers the Hanford Reach of the mainstem Columbia River to be a potential migratory corridor for bull trout. The Mainstem Upper Columbia River critical habitat unit (CHU) provides connectivity to the Mainstem Lower Columbia River CHUs and to 13 additional CHUs. This critical habitat is the main foraging, migration, and overwintering (FMO) habitat for the Entiat River core area and provides connectivity between several other core areas or critical habitat units. The FWS's Bull Trout Final Critical Habitat Justification indicates that bull trout reside year-round in certain areas of the mainstem of the Columbia River as either sub-adults or adults and that spawning adults may also use the mainstem of the Columbia River for up to 9 months.
Observation of bull trout in the Hanford Reach is rare, and the species may seldom use this migratory corridor. Resource scientists 2
at DOE's Hanford Site have characterized the use of the Hanford Reach by bull trout as transient. The FWS Bull Trout Final Critical Habitat Justification indicated that the accounts of bull trout in the Hanford Reach are "anecdotal" and are "likely individuals moved downstream during the spring freshet. Furthermore, the habitat and water temperatures in the Hanford Reach are not ideal for spawning, and the NRC did not identify any reports of spawning activity by bull trout in the vicinity of the CGS during its review for the proposed CGS license renewal.
The lack of spawning in the Hanford Reach means that there is no potential for young bull trout or bull trout eggs to be entrained or impinged at the CGS site. Furthermore, entrainment studies conducted in 1979-1980 and 1985 did not collect any life stage of bull trout. Impingement studies conducted over the same period did not observe any fish impinged on the intake screens. Healthy adult bull trout that commonly inhabit rivers with water velocities above 4 fps (1.2 m/s) would not be susceptible to impingement with a through-screen velocity of 0.5 fps (15 cm/s).
Regarding the heated effluent, bull trout actively select for cooler water, thus there would be little potential for them to be affected by the thermal or chemical discharge from the CGS plant. The thermal effluent from the blowdown discharge during the spring is a long, narrow plume, comprising approximately one percent of the width of the river, and bull trout would likely avoid it while migrating or foraging.
Conclusion Because the Hanford Reach of the river is neither spawning nor rearing habitat for bull trout and because bull trout are so rare in this area, the NRC staff's biological assessment concluded that the continued operation of CGS would have no effect on the bull trout. After further consideration, however, the NRC staff now believes that because the of the age of entrainment and impingement studies and the consideration that lack of bull trout in those samples would not absolutely preclude a take of bull trout in the future, its conclusion should be more protective and conservative. Therefore, the NRC staff revises its conclusion and now believes that operation of the CGS is not likely to adversely affect bull trout.
Please contact me if you have any further questions, Sincerely, Dennis Logan, Ph.D.
Ecologist U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0-11FI 11555 Rockville Pike Rockville, MD 20852-2738 Phone: 301.415.0490 Fax: 301.415.2002 3