MONTHYEARML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000237/20230052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Dresden Nuclear Power Station, Units 2 and 3 (Report 05000237/2023005; 05000249/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 IR 05000237/20230112024-08-0707 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 IR 05000237/20200012024-08-0606 August 2024 Reissue - Dresden Nuclear Power Station, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 ML24184A1712024-08-0202 August 2024 SLRA Schedule Letter RS-24-073, Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information2024-07-31031 July 2024 Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations – Additional Information Supporting Request to Withhold Security-Related Information ML24136A1322024-07-30030 July 2024 Transmittal Letter for Renewed License ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24193A0882024-07-24024 July 2024 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 1 Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations (Docket 50-10) ML24204A1862024-07-24024 July 2024 – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2; TSTF-591, Revision 0; and 10 CFR 50.69 IR 05000237/20243012024-06-27027 June 2024 NRC Initial License Examination Report 05000237/2024301; 05000249/2024301 ML24138A0572024-06-26026 June 2024 – Issuance of Amendment Nos. 285 and 278 Application to Adopt TSTF-564, Safety Limit MCPR ML24138A1812024-06-18018 June 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-063, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-06-14014 June 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 ML24128A2742024-06-14014 June 2024 Notice of Acceptance and Opportunity for Hearing - Letter ML24156A2332024-06-11011 June 2024 Letter Supplemental Information for Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities SVPLTR 24-0020, Registration of Use of Casks to Store Spent Fuel2024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel ML24183A2752024-05-30030 May 2024 Registration of Use of Casks to Store Spent Fuel RS-24-056, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2024-05-28028 May 2024 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24145A0432024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel 10 CFR 72.212 SVPLTR 24-0019, Registration of Use of Casks to Store Spent Fuel2024-05-23023 May 2024 Registration of Use of Casks to Store Spent Fuel ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24158A0012024-05-22022 May 2024 License Amendment Request to Adopt TSTF-564 (EPID L-2023-LLA-0120) Illinois State Concurrence ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24135A0722024-05-10010 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report ML24134A1132024-05-0808 May 2024 Retraction: LER 2303-001-00 for Dresden Nuclear Power Station, Unit 2, HPCI Inoperable Due to Air Void Accumulation ML24129A1352024-05-0808 May 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-59 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24092A3412024-05-0101 May 2024 SLRA - Receipt and Availability - Letter IR 05000237/20240012024-05-0101 May 2024 Integrated Inspection Report 05000237/2024001 & 05000249/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24127A0982024-04-30030 April 2024 Radioactive Effluent Release Report ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 IR 05000237/20244012024-04-18018 April 2024 – Security Baseline Inspection Report 05000237/2024401 and 05000249/2024401 ML24108A0082024-04-17017 April 2024 Application for Renewed Operating License RS-24-021, Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-222024-04-0202 April 2024 Response to Request for Additional Information for 10 CFR 50.55a Request No. I5R-22 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 2024-09-06
[Table view] Category:Licensee 30-Day Written Event Report
MONTHYEARRS-11-124, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE142011-07-28028 July 2011 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type GE14 SVPLTR 09-0044, Day Response on Inadvertent Control Rod Withdrawal2009-09-21021 September 2009 Day Response on Inadvertent Control Rod Withdrawal SVPLTR 09-0027, Written Follow Up Report on Release of Radionuclide2009-07-0606 July 2009 Written Follow Up Report on Release of Radionuclide RS-08-073, Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima22008-05-23023 May 2008 Plant Specific ECCS Evaluation Changes - 10 CFR 50.46 30-Day Report for Fuel Type SVEA-96 Optima2 ML0216407762002-06-0707 June 2002 Offsite Dose Calculation Manual (OCDM) Required Action Not Met During Units 2/3 Main Chimney Particulate, Iodine, and Noble Gas Sampling System Inoperability ML17252A3201977-11-23023 November 1977 LER 77-047/03L-0 for Dresden Unit 3 Regarding During Normal Unit 3 Operation, Surveillance Program Review Revealed Violation of T.S.1.0.CC.b Maximum Combined Interval Time by 3.5 Days for HPCI Monthly Valve and Pump Operability ML17252A2881977-05-0303 May 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-8 ML17252A2911977-04-22022 April 1977 License Event Report - Rod Withdrawal at Approx. 44% Power, Discovered Rod Block Monitor Channels 7 and 8 Automatically Bypassed ML17252A2901977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-10 ML17252A2711977-04-21021 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-9 ML17252A2721977-04-20020 April 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-7 ML17252A2751977-03-23023 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2821977-03-0202 March 1977 Transmittal of Reportable Occurrence Report No. 50-249/1977-4 ML17252A2581977-01-20020 January 1977 Transmittal of Reportable Occurrence Report No. 50-249/1976-36 ML17252A2701976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 IR 05000249/20190761976-12-0202 December 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-34 ML17252A2461976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-23 in Accordance with Technical Specifications, Section 6.6.B ML17252A2451976-11-0404 November 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-25 in Accordance with Technical Specifications, Section 6.6.B ML17252A2391976-10-22022 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-20 in Accordance with Technical Specifications, Section 6.6.B ML17252A2411976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-18 in Accordance with Technical Specifications, Section 6.6.B ML17252A2401976-10-21021 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-19 in Accordance with Technical Specifications, Section 6.6.B ML17252A2231976-10-12012 October 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-15 in Accordance with Technical Specifications, Section 6.6.B ML17252A2261976-09-30030 September 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-17 in Accordance with Technical Specifications, Section 6.6.B ML17252A2361976-07-0101 July 1976 Transmittal of Reportable Occurrence Report No. 50-249/1976-1 ML17252A2101976-02-0505 February 1976 Letter Submitting Reportable Occurrence Number 050-249/1976-3 in Accordance with Technical Specifications, Section 6.6.B IR 05000249/19750361975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1761975-09-0202 September 1975 Report of Abnormal Occurrence 50-249/75-36 Per Section 6.6.A of the Technical Specifications Re Reactor High Pressure Sensor Setpoint Drift ML17252A1711975-08-15015 August 1975 Report of A.O. Per Section 6.6.A of the Technical Specifications Isolation Condenser High Flow Sensor Setpoint Drift IR 05000249/19750321975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A1741975-07-31031 July 1975 Report of Abnormal Occurrence 50-249/75-32 Per Section 6.6.A of the Technical Specifications Failure of Restrainer Clamp Bolt Keeper on Jet Pumps ML17252A4471975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings IR 05000249/19750311975-07-0303 July 1975 Report of Abnormal Occurrence 50-249/75-31 for Dresden, Unit 3, Regarding Cracks in Control Rod Drive Collet Housings ML17252A7861975-03-27027 March 1975 Report of Abnormal Occurrence Per Section 6.6.a of the Technical Specification - Exceeding Set-point on Main Stream Line Hi Hi Rad ML17252A8271975-02-14014 February 1975 Report of Abnormal Occurrence Per Section 6.6.A of the Technical Specification - Reactor Feed Pump 3C Pump Casting Vent Line Weld Leak ML17252A8361975-01-14014 January 1975 Report of 4 Inch Recirculation Bypass Line Inspection 2011-07-28
[Table view] |
Text
Commonwe4t Edison Dresden Nuclear Power Station R.R. #1 Morris, Illinois* 60450 Telephone 815/942-2920 BBS Ltr. # 334 April 21, 1~77 Mr. James G. Keppler, Regional Director Directorate of Regulatory Operation - Region JI I U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, 111 inois 60137 Enclosed please find Reportable Occurrence report number 50-249/1977-9.
This report is being submitted to your office in accordance with the Dresden Nuclear Power Station Technical Specifications, Section 6.6.B.
Stephenson tation Superintendent .
Dresden Nuclear Power Station BBS:skm Enclosure cc: Director of Inspection & Enforcement Director of Management Information & P~ogram Control Fi 1e/NRC APR 2 G1977
L
LICENSE.E EVENT REPORT
.. *CONTROL BLOCK: l 1
91 I I I I 6
- .dASE PRINT ALL REQUIRED INFORMATION)
LICENSEE UC EN SE EVENT NAME LICENSE NUMBER TYPE TYPE
~I I I LI 0 1'-~1 1135 1 14 31 I 01° 1.:... I 0 I 0 I 0 I 0 I 0 1-1° I 0 I .1 4 *1 15 1 11 I 1I 1I I 0
1 11 7 89 25 26 30 ;31 32 REPORT. REPORT*
CATEGORY TYPE SOURCE DOCKET NUMBER EVENT DATE REPORT DATE
@TI]coN'T I I I L!J L!:J I 01 s 1 o 1~1 o 1 2 1 4 I 9 I I 0 I 4 1 1 I o I 71 7 I I7501 4j 212117 17 I 1 * *0 57 58 59 60 61 68 69 74 80 EVENT DESCRIPTION
[filfil I During control rod withdrawal operations at approximately 44% power, the unit 7 8 9 lo1 3 1 I 013erato.r discovered that Rod Block Monitor (RBM) channels 7 and 8 were automatically 7 89!:-'.---------------------------------~....;._----------__.J*
. 8 1
11 8 lol 4 1 .!;l__.b_y.;..p_a~s_s_e~d=-a_n_d_i_n_d_i_c_a_te_d__e_d_g_e__,r_o_d_s_e_l_e_c_t_ed___w_h_e_n_i_n_t_e_r_i_o_r_c_o_n_t_r_o_1_ro_d_B_-_s_w_a_s_____~l 11 (q{5j *j!;.._ @.; ;:~;.; ; ~" )'" *~:; ; ;*c" 't-"e. ___~:_J_.__o_t__h__e_r._*.;..i_n....t.e_r_io__r_c_o_n_t_r_o_l_r_o_d_s_w_e_re_t_h_e_n_s_e_l,....e_c_t_e_d_t_.o_c_h.,...e_c_k_t_h_e_f:..,.u_n_c_t.:....*i-'o_n_i_n_g--~1 8
7 8 9 lo Isl~ ~I__.,..,.o_f.__t_h_,e_R_B_M_.--*_c_o_n_t_r_o_l_ro_d_B.;..-_7_w_a_s_t_h_e_o_n_l_y_o_th_e_r__i n_t_e_r_i_o_r_c_o.;..n_t.._r_o_l_r_od__t h_a.,..t_w__a__s_ _ _ _s_Jl 7 8' 9 PRIME. (continued) 80
. SYST.EM CAUSE COMPONENT. COMPONENT COOE . . COOE COMPONENT CODE SUPPUER MANUFACTURER VDLATlJN
(§0 I I I B I LlJ I II N I sI Tl R I u I ~ I G I 0 I8 I 0 I ~
7 8 9 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION (olal I Investigation revealed that a shorted diode in the control rod select circuitry I 7 8 9 . . 80 lolsl 1~*--w_a_s___t_h_e....,....c_a_u_s_e_.~o-f_t_h_e_._s...pu___r_ro_u~s--R_B_M_b_y_p_a_s_~_a_n_d___ e_d_g_e_r_o:..,.d__s_e_1_e_c_t_e__d__i_nd-ic_a_t_io_n_f_o_r____~I 11
_
11 j ioj j~_b_.~_*t_h__c_o_n_t_r_o_l_r_o_d_s_B_-_7_a_n_d_B_-_s_.__T_h_e_d_e_f_e_c_t_iv_e_d_io_d_e_._w_a_s_r_e_p_l_a_c_e_d_,_a__nd_p_r_o_p_e_r_R_B_M___~l 1
8 7 8 9 80 FACIUTY METHOD OF . ('continued)
- . STATUS " POWER . OTHER STATUS DISCOVERY DISCOVERY DESCRIPTION EE1 l_Ll I 0 I 4 I 4 I *1.___N_A_ _ _ _-" ~ I See 11 Eve*nt Descr i pt i on 1*1 7 .a. 9 10 . 12 13 44 45 46 ,,. 80
.FORM OF
.ACTIVITY CONTENT rn RELEASED OF RELEASE AMOUNT . OF ACTIVITY LOCATION OF RELEASE
~ ~ l~_NA-.,,.;-----....J' NA 7 8 9 10 . 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION
[ill] I. o L ol 01 L.fJ .-=---*-N_A._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___;.....;...__~--_J 7 8 9 11 .12 .
- 13. BO PERS.ONNEL *1NJURIES NUMBER OESCRl°PTION
[ill] I 0 I 01 01.';::-*-*__._NA_*---------------~---~--~
7 a*s 11 12 00 OFFSITE , CONSEQUENCES
.E~L 7 8 9 NA 80 LOSS OR DAMAGE TO FACILITY TYPE . DESCRIPTION 7EID8 9lLl NA 10!::--------------------'--....--....;._--------------......:.--------8~0 PUBLICITY
[fill NA
. 7 8 9 80 ADDITIONAL FACTORS
- .
Eifil 7 8 9
- N 60 7~B.9~.----,.-----------.--.------~~----------------....:...------_..:.....:...__......."--~ ~ ED
.. NA-'\1E~.~._,___J_e_f_f_e_r_y....,.R_._w_o_J_*n_a_r_o_w""'s_k_i- - - - - - - - PHONE: _ _E_x_t_._\..;;;~23);;;;;2;;;.___
GPO a 111.* a 117
- EVENT DESCRIPTION (continued)
- found to cause :a oypass of the RBM system. Withdrawal of control rods B-7 and B-8 was suspended and an investigation was initiated.
The safety significance of this event was minimal because the RBM backs up p~ocedural rod selections. Although the Tech Specs require the RBM to be
- operab 1e above 30% power, the Tech Spec bases indicate that the RBM function is not necessary below 70% power. The significance was further mitigated by the core location of B-7 and B~8, since both control rods are located one position i~side the core periphery. This is not a repetitive occurrence.
(50-249/1977-9)
CAUSE DESCRIPTION (continued) operation was verif1ed before further withdrawals of control rods B-7 and B-8 were performed. All other interior control rods have been successfu(ly checked for similar problems. This is the first rep0,r_ted failure of any of these diodes. No further corrective action was deem~d~)warranted. The Rod Block Monitoring system. was supplied by the General Electric Company.