LER-2012-002, . Inoperable High Pressure Core Spray System Results in Loss of Safety Function
Perry Nuclear Power Plant
Event date: 06-11-2012
Report date: 08-02-2012
Reporting criterion: 10 CFR 50.73(a)(2)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Initial Reporting
ENS 48013 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
4402012002R00 - NRC Website

12. LICENSEE CONTACT FOR THIS LER

FACILITY NAME

Robert Swartz, Compliance Engineer, Regulatory Compliance, Perry Nuclear Power Plant TELEPHONE NUMBER (Include Area Code) (440) 280-7664

13. COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT

CAUSE" SYSTEM COMPONENT MANU-

FACTURER

REPORTABLE 1

TO EPIX CAUSE SYSTEM COMPONENT

MANU-

FACTURER

REPORTABLE

TO EPIX

B ED ECBD X999 Y

14. SUPPLEMENTAL REPORT EXPECTED

  • YES (If yes, complete EXPECTED SUBMISSION DATE). ►
  • NO

15. EXPECTED

SUBMISSION

DATE

MONTH DAY YEAR

ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines) On June 11, 2012, at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br />, with the plant in Mode 1 and the reactor operating at 73 percent of rated thermal power, plant operators determined that the High Pressure Core Spray (HPCS) system was inoperable. The HPCS system was inoperable due to the Division 3 DC Electrical Power Subsystem being declared inoperable at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br />.

The cause of the event was the failure of a High Voltage Shut Down (HVSD) board in the Unit 1 Division 3 Normal Battery Charger. The Division 3 DC Electrical Power Subsystem was declared inoperable as a result of this failure. The HPCS system was subsequently declared inoperable in accordance with Technical Specifications.

The Division 3 Reserve Charger was placed in service. The Division 3 DC Electrical Power Subsystem and the HPCS system were declared operable at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br />. The HVSD boards in the Unit 1 Division 3 and Unit 2 Division 3 Normal Battery Chargers will be replaced with boards that are not susceptible to the identified failure mode. The safety significance of this event is considered to be small.

This event is reported in accordance with 10 CFR 50.73(a)(2)(v)(D) as a condition that could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident.

Energy Industry Identification System (EDS) codes are identified in the text as [XX].

INTRODUCTION

On June 11, 2012, at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br />, with the plant in Mode 1 and the reactor operating at 73 percent of rated thermal power, the High Pressure Core Spray (HPCS) [BG] system was declared inoperable.

The Division 3 DC Electrical Power Subsystem [EJ] had been declared inoperable at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br /> and as a result, Technical Specifications (TS) required the HPCS system be declared inoperable immediately. The inoperability of the HPCS system represents a condition that could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident.

Therefore, at 1441 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.483005e-4 months <br />, notification was made to the NRC Operations Center (ENS Number 48013) in accordance with 10 CFR 50.72(b)(3)(v)(D), event or condition that could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident. This event is being reported in accordance with 10 CFR 50.73(a)(2)(v)(D) as a condition that could have prevented the fulfillment of the safety function of a system needed to mitigate the consequences of an accident.

EVENT DESCRIPTION

On June 11, 2012, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, the control room received unexpected Division 3 Diesel Generator Trouble and Division 3 Battery DC System Trouble alarms. Division 3 battery voltage was observed to be 130 VDC and lowering and it was determined that the Unit 1 Division 3 Normal Battery Charger had failed. The Division 3 DC Electrical Power Subsystem was declared inoperable due to not meeting TS Surveillance Requirement (SR) 3.8.4.1 which verifies battery terminal voltage to be >1= 129 volts and SR 3.8.7.1 which verifies correct breaker alignment and voltage to the required electrical power distribution systems. The plant entered TS Limiting Condition for Operation (LCO) 3.8.4, DC Sources- Operating, Condition B and TS LCO 3.8.7, Distribution Systems-Operating, Condition D. TS LCO 3.8.4 Required Action B.1 and TS LCO 3.8.7 Required Action D.1 require the HPCS system to be declared inoperable immediately. TS LCO 3.5.1, ECCS-Operating, Actions B.1 and B.2 were entered which require the Reactor Core Isolation Cooling (RCIC) [BN] system be verified operable within one hour and the HPCS system be restored to operable status within 14 days.

The Division 3 Reserve Charger , was placed in service at 0858 hours0.00993 days <br />0.238 hours <br />0.00142 weeks <br />3.26469e-4 months <br /> and battery voltage was restored to normal. After successful completion of required surveillances, the Division 3 DC Electrical Power Subsystem and the HPCS system were declared operable at 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br />. TS LCOs were exited at this time.

CAUSE OF EVENT

The as found condition of the Unit 1 Division 3 Normal Battery Charger included observations that the charger AC and DC breakers were closed and the High Voltage Shut Down (HVSD) board high voltage trip relay was in the tripped state. The HVSD trip relay actuates on a sensed high voltage of 140 VDC after a time delay of approximately ten seconds. The HVSD board is designed to pick up on a high voltage in the charger. When a high voltage is sensed, the unit disconnects the auxiliary voltage transformer which results in no control power for the charger. With no power for the control circuit, the charger shuts down.

Discussions with the original equipment manufacturer (OEM) identified that the HVSD board trip relay design was the cause of the battery charger failure. The mechanical latching trip relay is vulnerable to creep and/or mechanical agitation activation. The FENOC BETA Laboratory subjected the HVSD board that was installed during the event to mechanical agitation and was able to repeatedly trip the relay with minor agitation.

The failure mechanism for the Unit 1 Division 3 Normal Charger is a mechanical latching relay on the HVSD board that is susceptible to changing states when exposed to mechanical agitation. The apparent cause is less than adequate OEM design.

EVENT ANALYSIS

The HPCS system is a single train, Emergency Core Cooling System (ECCS) that performs a safety function to mitigate the consequences of a loss of coolant accident (LOCA). The function of HPCS is credited for several operational transients or analyzed accidents described in Chapter 15 of the Updated Safety Analysis Report (USAR). The HPCS system is designed to provide core cooling over a wide range of reactor pressure. Upon receipt of an initiation signal, the HPCS pump will automatically start after AC power is available and valves in the flow path begin to open.

The Division 3 DC Electrical Power Subsystem ensures the availability of DC electrical power for the systems required to shut down the reactor and maintain it in a safe condition after an anticipated operational occurrence (A00) or a postulated design basis accident (DBA). With one or more Division 3 DC Electrical Power Subsystems inoperable, the Division 3 powered systems are not capable of performing their intended functions. Immediately declaring the HPCS system inoperable allows the Actions of LCO 3.5.1, "ECCS Operating," to apply appropriate limitations on continued reactor operation.

A Probabilistic Risk Assessment (PRA) evaluation was performed for the Division 3 DC Electrical Power Subsystem being declared inoperable and the subsequent loss of safety function classification. In order to characterize the significance of the impact on core damage frequency, this evaluation utilized the approach contained in NRC Inspection Manual (IM) Chapters 0308, 0309 and 0609. A delta core damage frequency (ACDF) of 3.6E-10 was calculated based on an exposure time of 13 minutes (0845 when the Division 3 Normal Battery Charger failed to 0858 when the Division 3 Reserve Battery Charger was placed into service) for the event. Using the logic as discussed in IM 0609, the results indicate that ACDF is below 1E- 06, signifying a small quantitative impact. Based on this analysis, the event is below the threshold for being risk significant, and the risk of this event is therefore considered to have small safety significance in accordance with the regulatory guidance.

CORRECTIVE ACTIONS

The following corrective actions are planned as a result of this event:

  • The Unit 1 Division 3 Normal Battery Charger HVSD board will be replaced. The new board will have a magnetically latching relay that is not susceptible to tripping due to mechanical agitation.
  • The Unit 2 Division 3 Normal Battery Charger HVSD board will be replaced. This charger is currently functioning but is of similar design that may be susceptible to falsely tripping due to mechanical agitation.

PREVIOUS SIMILAR EVENTS

A review of Licensee Event Reports and the corrective action database for the past three years determined that no similar events had occurred.

COMMITMENTS

There are no regulatory commitments contained in this report. Actions described in this document represent intended or planned actions, are described for the NRC's information, and are not regulatory commitments.