ML18025B972

From kanterella
Revision as of 01:22, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Response to 830316 Request to Document Compliance W/Acceptance Criteria & Schedule for NUREG-0737,Item II.K.3.13, Separate HPCI & RCIC Initiation Levels. Criteria Will Be Met
ML18025B972
Person / Time
Site: Browns Ferry  
Issue date: 05/24/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.13, TASK-TM NUDOCS 8305270030
Download: ML18025B972 (3)


Text

REGULATOR'r NFORMATION DISTRIBUTION 8 < EM (RIOS~

ACCE'SSION NBR:830S270030

"

OUTDATE: 83/05/24 NOTARIZED:'ES DOCKET ¹ FACIL:50-259 Browns Ferry iVuclear Power Stationr Unit 1< Tennessee 0503LO 50 260 Browns Ferry Nuclear Power Station< Unit 2E Tennessee BYNAME JUKZEL0 50 296 Browns Ferry Nuclear Power Stationg Unit 3E Tennessee 05000296 AUTH AUTHOR AFFILIATION MILLStL ~ M ~ Tennessee Valley Authority REC IP. NAME RECIPIENT AFFILIATION DENTONgH ~ RE Office of Nuclear Reactor Regulationi Director

SUBJECT:

Forwards response to 830316 request to document compliance w/acceptance criteria 8 schedule for NUREG 0737'tem II' 3 13'eparate

~ ~ HPCI 8 RCIC Initiation Levels."

Criteria will be met ~

DISTR ISUTION CODE: AD<<OS COPIES RECEIVED:LTR ENCL ~ SIZE:

TITLE: OR Submittal': TMI Action Plan Rgmt NUREG 0737 8 NUREG-0660 NOTES:NMSS/FCAF NMSS/FCAF 1cy icy'cyicy NMSS/FCAF/PM. 05000259 05000260

~

1cy, icy NMSS/FCAF/PM.

NMSS/FCAF/PM'MSS/FCAF OS000296 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IO CODE/NAME LTTR ENCL NRR ORB2 BC 01 7 7 INTERNAL; ELO/HDS4 0 IE/OEPER OIR 33 1 1 IE/DEPER/EPB 3 3 IE/DEPER/IRB 1 1 NQR PALVLSONE Vl ~ . 1 ,ERR/DHFS/DEPY29 1 1 NRR/DL DIR 14 1 1 NRR/DL/ADL 16 1 1 NRR/DL/DRAB 18 3 3 NRR/OS I/AORS 27 1 NRR/DSI/AEB 1 1 NRR/OS I/ASB 1 NRH RAB 1 1 NRR/D ST OIR 30 1 1 04 1 1 RGN2. 1 1 EXTERNAL: ACRS 34 10 10 INPOgJ ~ STARNES 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 NOTES:

TOTAL NUMBER OF COPIES REQUIRED: LTTR 44 ENCL 43

TENNESSEE VALLEY AUTHORITY C'iATTANoosA . KV~JKSSK- 37~0l 400 Chestnut Street Tower II May 24, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

In the Matter of the Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 By letter from D. B. Vassallo to H. G. Parris dated March 16, 1983, we received the NRC staff Safety Evaluations and plant specific acceptance criteria for NUREG-0737, Item II.K.3.13, RCIC Automatic Restart. The letter requested that we document compliance with the criteria and provide a schedule for implementation at the Browns Ferry Nuclear Plant.

Enclosed is our response.

Very truly yours, TENNESSEE VALLEY AUTHORITY Q>

L. M. Mills, i anager Nuclear Licensing Subscribed, agd sworn to before me this~~~ day of +%7 r . 1983.

7i(.u/N Notary Publio 0, )I- M~

My Commission Expires Enclosure cc (Enclosure):

U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. R. J. Clark Browns Ferry Prospect Manager 5 U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 I (

8305270030 830524 PDR ADOCK 05000259 P PDR

ENCLOSURE COMPLIANCE WITH ACCEPTANCE CRITERIA AND SCHEDULE FOR NUREG>>0737, ITEM II.K.3. 13 BROMNS FERRY NUCLEAR PLANT Me have reviewed our proposed design and have concluded that the criteria will be met. However, the proposed design does not annunciate on high reactor vessel level trip., This is acceptable since restart of the RCIC will be automatic if water level decreases to the low water level initation setpoint. Tripping of the trip throttle valve is still annunciated in the main control rooms and requires operator action to be reset.

By letter from L. M. Mills to H. R. Denton dated January 14, 1983, we submitted the latest revision (Revision 2) of the Browns Ferry integrated modification schedule. The schedule for performing modifications required by II.K.3. 13 was included.

A functional test will be performed upon completion of this modification.