ML18092B106
ML18092B106 | |
Person / Time | |
---|---|
Site: | 03035572 |
Issue date: | 02/14/2018 |
From: | Craig Gordon NRC Region 1 |
To: | Rodriguez C Geo Engineering |
References | |
IR 2018001 | |
Download: ML18092B106 (1) | |
See also: IR 07200201/1980001
Text
NRC FORM 591M PART 1 U.S. NUCLEAR REGULATORY COMMISSION
(07-2012)*
SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION
1. LICENSEE/LOCATION INSPECTED: 2. NRG/REGIONAL OFFICE
GeoEngineering, LLC
P.O. Box 270328
U.S. Nuclear Regulatory Commission
San Juan, Puerto Rico 00927
Region I, 2100 Renaissance Blvd, Suite 100
King of Prussia, Pennsylvania 19406-2713
REPORT NUMBER(S) 2018-001
DATE(S) OF INSPECTION
3. DOCKET NUMBER(S) , 4. LICENSE NUMBER(S) 15. February 14, 2018
30-35572 52-25266-01
LICENSEE:
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear
Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:
X 1. Based on the inspection findings, no violations were identified.
! 2. Previous violation(s) closed.
3. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-
identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to
exercise discretion, were satisfied.
Non-cited violation(s) were discussed involving the following requirement(s) and corrective action(s):
! 4. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being
i cited in accordance with the NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in
accordance with 10 CFR 19.11. (Violations and Corrective Actions)
Statement of Corrective Actions
I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of
corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken,
date when full compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.
1--------T_it_le_ _ _ _ _ _+---_ _ _ _ _P_r_in_t_e_d_N_a_m_e_ _ _ _ _ _+-_ _ _ _ _S_ig~n_a_t_ur_e_ _ _ _ _-+_____ D_at_e____ _
LICENSEE'S REPRESENTATIVE
NRC INSPECTOR I P.
~C_ra_ig_G_o_rd_o_n_,s_r_._He_a_lt_h_P_hy_s_ic_is_t-~---'J_~llf.~~)~-~-'-------+--3-/1-5/_1_8.--~
~) L
BRANCH CHIEF Art Burritt, Chief, CIRDA I 3/(:/18
~JJ\~
- NRC FORM 591M PART 1 (07-2012) (RI Rev. 09/12/2013) G:\WordDocs\Current\lnsp Record\R52-25266-01.2018-001 591 M-Part1 .doc
SUNSI Review Completed By: / RA I CG 0 Public Q Non-Sensitive
This document becomes an NRC Official Agency Record once it is signed by the Branch Chief