Key Management Personnel Update
ML18184A516
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 06/28/2018
From: Gerald Bichof
Dominion Energy Co, Dominion Energy Kewaunee, Dominion Energy Nuclear Connecticut, Dominion Energy Services, Virginia Electric & Power Co (VEPCO)
To: Darryl Parsons
Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
References
18-109A
Download: ML18184A516 (2)


Text

Dominion Energy Services, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com ii; Dominion

~ Energy SECURITY-RELATED INFORMATION WITHHOLD. UNDER 10 CFR 2.390 10 CFR 95.18 June 28, 2018 Mr. Darryl Parsons, Chief Serial No.: 18-109A Information Security Branch NRA/MAE: RO Di.vision of Security Operations Docket Nos.: 50-305 Office of Nuclear Security and Incident Response 50-245/336/423 U.S: *Nuclear Regulatory Commission 50-338/339 11555 Rockville Pike 50-280/281 Rockville, MD 20852-2738 License Nos.: DPR-43 DPR-21/65

  • NPF-49 NPF-4/7 DPR-32/37 DOMINION ENERGY KEWAUNEE, INC.

DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

VIRGINIA ELECTRIC AND POWER COMPANY KEWAUNEE POWER STATION MILLSTONE POWER STATION UNITS 1, 2, AND 3 NORTH ANNA POWER STATION UNITS 1 AND 2

  • SURRY POWER STATION UNITS 1 AND 2 KEY MANAGEMENT PERSONNEL UPDATE In a letter dated September 22, 2015*, the NRC notified Dominion Energy Kewaunee, Inc., Dominion Energy Nuclear Connecticut, Inc., and Virginia Electric and Power Company (collectively, the Licensees) that they would retain their non:..possessing facility security clearances at SECRET - National Security Information leveL This letter also identified Key Management Personnel (KMP) that were granted an access authorization (security clearance). Since September 2015, there have been personnel changes that affect the individuals that were ident_ified as KMP. The purpose of this letter is to designate new KMP.

The KMP for the Licensees will be the Facility Security Officer (FSO) at each site and the corporate office. The current FSOs are identified in the attachment to this letter and have each been granted an access authorization at their facility clearance level. The NRC will be notified of future changes in the FSOs in accordance with 10 CFR 95.19(b). ;J5I /(Og THE ATTACHMENT TO.THIS LETTER CONTAINS SECURITY-RELATED INFORMATION AND MUST /vi DD /p BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ATTACHMENT, THIS LETTER IS *, \S (/L "DECONTROLLED." /V

JfJZ..

I Serial No. 18-109A Page 2 of 2 If you have any questions, please contact Margaret Earle at 804-273-2768.

Sincerely, Ge1~~~

Senior Vice President - Nuclear Operations & Fleet Performance Dominion Energy Kewaunee, Inc.,

Dominion Energy Nuclear Connecticut, Inc. and Virginia Electric and Power Company Commitments made by this letter: None cc: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. Keith Everly Information Security Branch Division of Nuclear Security Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Mail Stop 02 D 15 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Douglas Hase Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Mail Stop 02 D 15 11555 Rockville Pike Rockville, MD 20852-2738