January 2, 2003Mr. Biff BradleyNuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
DECEMBER 19, 2002:
SUMMARY
OF MEETING WITH RISK-INFORMEDTECHNICAL SPECIFICATION TASK FORCE (RITSTF)
Dear Mr. Bradley:
The purpose of this letter is to transmit the summary of a meeting with the RITSTF. The meeting was held at the U.S. Nuclear Regulatory Commission offices in Rockville, Maryland, on December 19, 2002.Sincerely,/RA/Robert L. Dennig, Section Chief Technical Specifications Section Operating Reactor Improvements Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
Enclosures:
- 1. Meeting Summary
- 2. Attendance List
- 3. Agenda
- 4. RITSTF Initiative Statuscc w/encl: See attached page
PACKAGE: ML023570042, LETTER: ML023570044,ENCLOSURE 4: ML023570054 DOCUMENT NAME: G:\RORP\TSS\TJADER\RITSTF-MTGsum-12-19-02.wpdOFFICESRE:TSS:RORP:DRIPSC:TSS:RORP:DRIPNAMETRTjaderRLDennigDATE01/02/200301/02/2003 Mr. Biff Bradleycc via e-mail
- Mr. Tony Pietrangelo Nuclear Energy InstituteMr. Biff BradleyNuclear Energy InstituteMr. Mike SchoppmanNuclear Energy InstituteMr. Alan Hackerott, ChairmanOmaha Public Power DistrictMr. Jim KennyPennsylvania Power & Light CompanyMr. James AndrachekWestinghouse Electric CompanyMr. Jack StringfellowSouthern Nuclear Operating CompanyMr. Donald McCamyBrowns Ferry Nuclear PlantMr. Ray SchneiderWestinghouse Electric CompanyMr. Frank Rahn EPRIMr. Wayne HarrisonSTPMr. Drew RichardsSTPMr. Gabe SalamonPSEG NuclearMr. Rick HillGeneral Electric Nuclear EnergyMr. Michael S. Kitlan, Jr.Duke Energy CorporationMr. Noel ClarksonDuke Energy CorporationMr. Donald HoffmanEXCEL Services CorporationMr. Ted BookFramatech-ANPMr. R. J. SchomakerFramatech-ANPMr. J. E. RhoadsEnergy NorthwestMs. Deann RaleighScientechMr. Ken Canavan DS&SMr. Sam Chien SCEMr. Gary ChungSCE-SONGSMr. Courtney SmythPSEG Nuclear LLCMr. Jerry AndreWestinghouse Electric Company DISTRIBUTION
WDBeckner (RidsNrrDripRorp)
GMHolahan (RidsNrrDssa)
RJBarrett (RidsNrrSpsb)
JZwolinski (RidsNrrDlpm)
JNHannon (RidsNrrDssaSplb)
TRQuay (RidsNrrDipmlqmb)
OGC (RidsOgcRp)
ACRS/ACNW (RidsAcrsAcnwMailCenter)
MKotzalas (MXK5)
MLWohl (MLW1)
NSaltos (NTS)
MRJohnson (MRJ1)
WScott (WES)
GSShukla (GSS)
FMReinhart (FMR)
AWMarkley (AWM)
SLMagruder (SLM1)
RFDudley (RFD)
DFThatcher (DFT)
MACaruso (MAC)
MLScott (MLS3)
EMMcKenna (EMM)
MACunningham (MAC3)
ASKuritzky (ASK1)
ASingh (AXS3)
MTMarkley (MTM)
SDAlexander (SDA)
SUMMARY
OF THE DECEMBER 19, 2002, NRC/INDUSTRY MEETING OF THERISK-INFORMED TECHNICAL SPECIFICATION TASK FORCEThe NRC staff met with the NEI Risk-Informed Technical Specification Task Force (RITSTF) on December 19, 2002, from 8:30 a.m. to 11:00 a.m. The meeting attendees are listed in .The agenda (Enclosure 3) consisted of discussions of the seven active RITSTF initiatives. TheRITSTF provided a summary of the status of the initiatives (Enclosure 4). Following is a brief description of the status of the initiatives in the order in which they were discussed.Initiative 7, Non-TS support system impact on TS operability determinations: The RITSTFsubmitted TSTF-372, Revision 2, on snubber inoperability, on August 7, 2002. The NRC staffresponded in a letter dated December 13, 2002 to resolve open issues, which deal with single versus multiple train inoperabilities, supported system LCO entry, and the risk analysis. Details of the letter were discussed. The RITSTF will submit a new revision to TSTF-372 based upon the letter by January 3, 2003. The RITSTF offered to assist the NRC in revising GL 91-18, and ensuring consistency between it, Initiative 7 and TSTF-372. The RITSTF will submit the Initiative 7 TSTF-427 by February 6, 2003.Initiative 5, Relocation of non-safety SRs (5a) and relocation of all SR frequency requirements(5b) out of TS: The RITSTF will develop a Guidance Document on an Initiative 5b methodologyand provide it to the NRC by February 15, 2003. The RITSTF will get a pilot plant to test the proposed program and procedures. After NRC review and acceptance of the Guidance Document, and the results of the pilot plant application are evaluated, the RITSTF will prepare and submit TSTF-425 by December 15, 2003. The RITSTF will submit a TSTF to relocate some SRs under Initiative 5a by June 30, 2003.Initiative 3, TSTF-359, Modification of mode restraint requirements of LCO 3.0.4 & SR 3.0.4
- The first CLIIP Federal Register Notice was published on August 2, 2002, requesting publiccomments. Public comments have been received and are being addressed. The content of TSTF 359, Revision 7 was discussed at the last meeting, and the RITSTF submitted TSTF-359 Revision 8 on December 4, 2002. The staff will prepare a revised model safety evaluation incorporating changes resulting from public comments to the FRN and TSTF-359 Revision 8.
The staff will publish the final CLIIP Federal Register Notice announcing availability as soon as all issues are resolved, which is expected to be completed in February 2003.Initiative 1, TS Actions End States Modifications: The BWR topical SER was issued onSeptember 27, 2002. The BWR TSTF-423 is being developed and will be submitted byFebruary 24, 2003. The RITSTF will submit a revision to CE TSTF-422 by January 21, 2003, to expand its applicability from a loss of single train to address a loss of LCO function, and add associated justifications.Initiative 4b, Risk Informed AOTs: The NEI RITSTF is coordinating multiple pilot programs,including CEOG and STP pilots, to ensure a single integrated methodology for Initiative 4b. Apilot plant that has converted to the STS is being sought by the RITSTF. The RITSTF will provide a draft management guidance document, an STP pilot application, a CEOG single system TSTF, and an integrated TSTF-424 in January 2003. Once these are received an ACRS meeting will be scheduled to discuss Initiative 4b.Enclosure 1 Initiative 6, Modification of LCO 3.0.3 Actions and Completion Times: The staff is preparing anSER on the CEOG Initiative 6b/c submittal, and it is expected to be completed by March 2003once the final CEOG issues are formally resolved. The RITSTF then plans to submit a comprehensive TSTF-426 by May 31, 2003.Initiative 8a, Remove/Relocate non-safety and non-risk significant systems from TS that do notmeet 4 criteria of 10 CFR 50.36: The RITSTF will interface with the NRC in the development ofguidance and a methodology, based on NEI 00-04, for the application of the four criteria of 10 CFR 50.36. The RITSTF will develop a white paper on Initiative 8a, outlining the guidance and methodology for implementation in the second quarter of CY 2003.Mary Drouin of NRC Research announced that there would be a public workshop on DG-1122,the PRA quality guidance document that endorses the ASME PRA Standard, at 9 a.m. on January 9, 2003 in the NRC Auditorium. At the workshop the need for a pilot plant will be
discussed.The next NRC TSS/NEI RITSTF meeting is scheduled for March 5, 2003, at the NRCHeadquarters in Rockville, MD.
NRC/INDUSTRY MEETING OF THERISK-INFORMED TECHNICAL SPECIFICATION TASK FORCE ATTENDANCE LISTDECEMBER 19, 2002NAMEAFFILIATIONTONY PIETRANGELONUCLEAR ENERGY INSTITUTEBIFF BRADLEYNUCLEAR ENERGY INSTITUTE MIKE SCHOPPMANNUCLEAR ENERGY INSTITUTE DONALD HOFFMANEXCEL SERVICES ALAN HACKEROTTOPPD JIM ANDRACHEKWESTINGHOUSE/WOG MIKE KITLANDUKE ENERGY NOEL CLARKSONDUKE ENERGY JACK STRINGFELLOWSOUTHERN NUCLEAR OPERATING COMPANY J. E. DUSTY RHOADSENERGY NORTHWEST/BWROG DON McCAMYTVA DREW RICHARDSSTP DEANN RALEIGHLIS, SCIENTECH BOB DENNIGNRC/NRR/DRIP/RORB/TSS BOB TJADERNRC/NRR/DRIP/RORB/TSS KERRI KAVANAGHNRC/NRR/DRIP/RORB/TSS NICK SALTOSNRC/NRR/DSSA/SPSB MILLARD WOHLNRC/NRR/DSSA/SPSB MICHAEL JOHNSONNRC/NRR/DSSA/SPSB MARK REINHARTNRC/NRR/DSSA/SPSB MARK CARUSONRC/NRR/DSSA/SPSB STEPHEN ALEXANDERNRC/NRR/DIPM/IEHB STU MAGRUDERNRC/NRR/DRIP/RPRP MARY DROUINNRC/RES/DRAA/PRAB LEILA PETERSONWPIEnclosure 2 AGENDATSB/NEI RITSTF MeetingDecember 19, 2002 from 8:30 AM to 4:00 PM, in O-13B4 Status of Initiatives Initiative 7, Non-TS Support System Inoperability Impact on TS System & TSTF-372 Initiative 5, STI Evaluation Methodology Initiative 3, LCO 3.0.4 & SR 3.0.4 (Mode Restraint) FlexibilityFinal FRN Initiative 1, End StatesCEOG TSTF-422 BWROG TSTF-423 Public Questions and Discussion Initiative 4b, RI AOTs with CRMPIndustry proposed approaches, pilots Integration Plan and Guidance Document CEOG TSTF Initiative 6, LCO 3.0.3 Actions and Completion TimesCEOG RAI Responses and final submittal Initiative 8a, Remove/Relocate non-safety & non-risk significant systems from TSPublic Questions and DiscussionSchedule Next MeetingClosing CommentsEnclosure 3