Morning Report Date:
MAR 19, 2007 PRIORITY ATTENTION REQUIRED MORNING REPORT -
REGION I Licensee/Facility:
Notification:
1-2007-0008 03/17/2007 MR Number:
ENTERGY NUCLEAR GENERATION COMPANY
[1] GE-3 Date: Pilgrim Call from Licensee Plymouth, Massachusetts 050-00293 Dockets: Pilgrim Manual Reactor Shutdown.
Subject:
On March 17, 2007, the Pilgrim reactor was manually shutdown due to increasing unidentified drywell leakage.
Upon drywell entry, a steam leak was identified from the packing of a 6-inch reactor water cleanup valve. The
valve was repacked and will be tested during plant heatup/pressurization. Startup commenced at approximately
6:00 a.m. on March 19, 2007.
Discussion:
Contact: Email: Phone No: Org: POWELL, RAYMOND J RJP@nrc.gov (610) 337-6967 R1