/1* /it 0//JON S. CORZINE /Governor //`ýtate of Nefu Tejrsmt DEPARTMENT OF ENVIRONMENTAL PROTECTION Division of Environmental Safety and Health Radiation Protection and Release Prevention Element Bureau of Nuclear Engineering P. 0. Box 415.Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 MARK N. MAURIELLO Acting Commissioner May 20, 2009 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Commissioners:
Subject:
Salem Generating Station Units 1 and 2 Docket Nos. 50-272 and 50-311 License Amendment Request S09-01 Request for Change to Technical Specifications Definition of Fully Withdrawn Rod Cluster Control Assemblies PSEG Nuclear LLC submitted the proposed changeto the Salem Technical Specifications by letter to the NRC dated March 22, 2009. The proposed amendment would rev'ise the definition of the fully withdrawn position of the Rod Cluster Control Assemblies (RCCA) to minimize local RCCA wear.This change would revise the definition of fully withdrawn from between 222 and 228 steps above rod bottom to between 222 and 230 steps above rod bottom.The BNE has no comments on the proposed change. If you need to discuss this subject further, please contact Elliot Rosenfeld at (609) 984-7548.Sincerely, Patrik ulligan, Marnia er Bureau of Nuclear Engineering I-'4014 New Jersey is an Equal Opportunity Employer, Printed on Recycled Paper and RecyClable Distribution Dr. Jill Lipoti, DEP Paul Baldauf, DEP Elliot Rosenfeld, DEP Nancy McNamara, NRC Region 1 Rick Ennis, NRC Licensing Project Manager Christine Neely, Director -Regulatory Assurance, PSEG Nuclear LLC William Mattingly, Regulatory Assurance Manager, Salem Generating Station