|
---|
Category:Facsimile
MONTHYEARML15014A0612015-01-0808 January 2015 Notification of Potential Part 21 Re Failure of Sbm Type Switches ML1006101292010-03-0101 March 2010 Preliminary RAIs for FSAR Sections 9.4.4 & 9.4.8 ML1006101482010-03-0101 March 2010 Preliminary RAIs for FSAR Section 2.3 2015-01-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 ML18270A2362018-09-26026 September 2018 NRR E-mail Capture - Watts Bar Units 1 and 2 RAIs - Modify TS 3.8.9 Completion Time for Inoperable 120V AC Vital Buses (L-2018-LLA-0050) 2024-09-10
[Table view] |
Text
FACSIMILE TRANSMITTAL TO: Joseph McCarthy Joel Wiebe, Sr. Project COMPANY: DATE: Tennessee Valley Authority 3/1/2010 FAX NUMBER: TOTAL NO. OF PAGES INC. COVER: (423) 365-3833 3 PHONE NUMBER: SENDER'S REFERENCE NUMBER: (423) 365-3251 D URGENT D FOR REVIEW D PLEASE COMMENT D PLEASE REPLY NOTES/COMMENTS:
For discussion
-Preliminary RAls for FSAR Section 2.3 REQUEST FOR ADDITIONAL WATTS BAR, UNIT FINAL SAFETY ANALSIS REPORT, AMENDMENT SECTION 2.3, DOCKET NO. Nuclear Regulatory Commission (NRC) staff noted that only some of the meteorological information in Amendment 94 appeared to be updated when compared with prior Watts Bar, Unit 2, Final Safety Analysis Report (FSAR) amendments.
Provide additional information regarding what criteria were used to determine which meteorological parameters and associated analyses should be updated. Please provide an assessment of the Watts Bar, Unit 2, design bases and safety structures, systems and components potentially impacted by meteorological phenomena and how they could be impacted.
Include a discussion to confirm that all relevant meteorological parameters and analyses were examined and updated, if appropriate.
This should include consideration of changes in the limiting values resulting from, 1) the addition of recently measured data to the compiled historic climate data base and, 2) resultant changes in locations that are found to be more limiting than those locations identified in prior FSAR amendments. In several cases, it appears that changes in tables were highlighted, but the text discussing the table or an analysis using the information in the table does not appear to have been revised. Provide additional information regarding what criteria were used to determine when the text should be revised, if a table had been revised. For example, NRC staff notes that the annual occurrence of fog at Oak Ridge, Tennessee (TN), as presented in Table 2.3-12 is considerably greater than suggested in the text of Section 2.3.2.2, which was not annotated with a change bar in the margin. In several cases, it appears that the period of record for extreme values has been changed to a more recent period, rather than appending the more recent period to the longer historic period cited in prior FSAR amendments.
Provide additional information regarding what criteria were used to determine which historic extreme weather data should be removed from consideration rather than using the entire historic period of record. In Section 2.3.1.3, the period of record of the single tornado occurrence in Rhea County in which Watts Bar, Unit 2, is located has been updated. However, it appears that the reference citation does not include the full period discussed in the text. Further, calculation of the probability that a tornado will strike the Watts Bar site is based on data of tornado occurrences between 1950 and 1986 in a 30 nautical mile radius area centered at the onsite meteorological tower and the track of the single tornado that is recorded to have occurred in Rhea County. Please provide additional information describing whether the analysis in Amendment 94 is limiting with respect to reported tornado occurrences subsequent to 1986 and areas neighboring Rhea County. Updated wind speed values for high winds in Section 2.3.1.3 refer to the fastest mile of wind, but data in the references cited in the Section 2.3.1.3 text are reported as 3-second gust wind speeds. Please discuss this apparent discrepancy.
How does the more recent data provided in Amendment 94 compare with the historic fastest mile wind speed data in prior FSAR amendments?
Enclosure
-2Section 2.3.2.2 states that the mean minima temperature for both Chattanooga and Dayton, TN, ranged from about 24° F to about 74° F for Dayton and 75° F for Chattanooga based upon data measured between 1971 -2000. How do values in Tables 2.3-2 and 2.3-3 support these estimates?
With regard to extreme minima temperature values recorded in the Watts Bar area, NRC staff noted that measurements made at three other National Oceanic and Atmospheric Administration (NOAA) Climate Division TN 1 locations, Knoxville, Sevierville, and Tazewell, TN, were reported as -24 ° F in NOAA "Climatography of the United States 1\10. 20," summaries.
This value is more limiting than the -15 ° F minima cited for Dayton in Table 2.3-2. Given that these locations are all within Climate Division TN 1, please describe why the use of the Dayton minima is acceptable although it has been exceeded at at least three other locations in the same climatic region as Dayton. Please note the following editorial clarifications and make changes as appropriate: It appears that the reference to "Decatur" in Section 2.3.2.2 should be to "Dayton," based on information provided in Table 2.3-2. The reference list and/or citations in the text may not have been properly updated in all cases. For example, the discussion of tornadoes in Section 2.3.1.3 stateS that data from 1916 -2008 were considered, but the latest date of the three listed references is 1989. Reference 13 regards climatic data at Dayton, TN, but the citation in Section 2.3.1.3 discusses Chattanooga and Knoxville, TN. In Table 2.3-1 the December, January and February thunderstorm day frequency values for Knoxville appear to be printed on a single line, with no entries on the lines for January and February.
Also, is the footnote reference to Knoxville, TN, data essentially the same as for the Chattanooga, TN, data, except for Knoxville? One or more of the values cited in Tables 2.3-5 and 2.3-6 appear to be different than values given in the cited references. The period of record for the data in Table 2.3-7 appears to be the 30 year normal for 1971 -2000 rather than 1979 -2008. What reference does the superscript "b" footnote? Table 2.3-12 provides two periods of record for each of three locations, a 30-year interval from 1979 -2008 and a second period of record of a specified number of years (e.g., 45 years). Provide additional information to explain how these two periods of record are correlated for each location when they appear to be of different durations.