ML18144A961

From kanterella
Revision as of 05:45, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
FAQ 18-01 Definition of Initial Transient Final Approved
ML18144A961
Person / Time
Issue date: 05/25/2018
From: Alex Garmoe
NRC/NRR/DIRS/IRAB
To:
Garmoe A, NRR/DIRS, 415-3814
References
FAQ 18-01
Download: ML18144A961 (2)


Text

NOTE This FAQ would implement a whitepaper that proposed clarifications of the definition of "Initial Transient". The whitepaper was discussed with the NRC staff in public ROP meetings in 2013-2014. The final discussion of the whitepaper occurred at a May 14, 2014 public meeting. The NRC staff member who had the lead on performance indicators at the time was Andrew Waugh, who is listed below as the NRC Contact. The concluding discussion is documented in an NRC meeting summary available in ADAMS at accession number ML14149A293. The proposed text changes presented below reflect NRC comments and suggested edits for agency approval presented in a mark-up of the whitepaper attached to the aforementioned meeting summary. The marked-up whitepaper is available under ADAMS accession number ML14149A278.

20 Was pressure control unable to be established following the initial transient?

39 Following initial transient, did stabilization of reactor pressure/level and drywell pressure 40 meet the entry conditions for EOPs?

Initial Transient

Initial Transient