ML18213A138

From kanterella
Revision as of 23:28, 16 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Uncompleted ITAAC Notification Checklist (UINC) 3524 for ITAAC 2.6.03.07 (Index No. 616) for Vogtle Unit 3
ML18213A138
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/19/2018
From:
Human Performance, Operator Licensing & ITAAC Branch
To:
Kleeh E
References
ITAAC 2.6.03.07
Download: ML18213A138 (2)


Text

UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC) Page 1 of 2 A Lead Reviewer in concert with other reviewer(s) assigned to an uncompleted ITAAC notification (UIN) review will complete this form for the ITAAC under review. Docket No: 5200025 Plant Name: Vogtle Unit 3 Combined License Licensee Name: Southern Nuclear Operating Company, Inc. Combined License No: NPF-91 ITAAC ID No: 2.6.03.07 ITAAC Type: Targeted ITAAC Family Designation or enter N/A: 08F Uncompleted ITAAC Notification (UIN) ADAMS ML No: ML18152B686 Name of Lead Reviewer: Kleeh, Edmund a. Yes The UIN identifies all of the following: (1) licensee, (2) plant site name, b. Yes The ITAAC as stated in the UIN matches the ITAAC as stated in the combined license. c. No NRC personnel with the requisite technical and engineering knowledge has/have determined that the ITAAC Completion Description (ICD) of the UIN contains sufficient information, including summarizing the methodology for performing the ITAAC, to demonstrate that the licensee will successfully perform the inspection, test, and/or analysis stated in the ITAAC if the licensee uses the methodology described in the UIN. The methodology described in the ICD of the UIN either was reviewed and approved by the NRC, or is acceptable based on sound scientific, mathematical, and/or engineering principles, and is repeatable, if necessary, without any significant change to the reported result. d. No NRC personnel with the requisite technical and engineering knowledge has/have determined that the ICD of the UIN contains sufficient information to demonstrate that the licensee will be able to show that it has fully met the entire acceptance criterion stated in the ITAAC if it performs the ITAAC as stated in the UIN. e. N/A -systems, or components (SSCs): If the UIN indicates that the inspections, tests, and/or analyses of the ITAAC are being performed at UNCOMPLETED ITAAC NOTIFICATION CHECKLIST (UINC) Page 2 of 2 location(s) other than the final installed location, then the UIN, based on the guidance in NEI 08-01 either summarizes a technical justification or provides a reference to a generic technical justification in the ICD of the UIN that establishes why it is acceptable to perform the ITAAC at location(s) other than the final installed location. [Enter N/A if the ITAAC is not being performed at a remote location or if the ITAAC is not - f. No An additional reviewer was assigned to the UIN review with his or her name entered into the blank at the top of this page based on his or her expertise being required description of the proposed methodology for completing the ITAAC. The UIN review is not based on consideration of actual performance of the ITAAC, the acceptance criteria results, the completion of NRC inspections, or the resolution of NRC inspection findings, if any. These closure notification (ICN) for that ITAAC. The NRC staff plans to rely on a UIN review in its review of the later ICN to the extent that the ITAAC completion methods described in the UIN and ICN are the same, subject to new information that might arise between the UIN and ICN reviews. Lead Reviewer: Kleeh, Edmund Date: 7/19/2018 Lead Approver: Welch, Christopher Date: 7/19/2018 Licensing PM: Hoellman, Jordan