ML19036A718

From kanterella
Revision as of 15:06, 12 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Final Model SGI Protective Order for ITAAC Hearings
ML19036A718
Person / Time
Issue date: 02/07/2019
From:
NRC/OGC
To:
Spencer M
Shared Package
ML19036A708 List:
References
NRC-2018-0190
Download: ML19036A718 (15)


Text

See

shouldas appropriateSeee.g.See TEMPLATE KEY:

  • Brackets ("[" and "]") designate information that will need to be inserted into the document when it is issued in a specific proceeding.
  • Curly brackets ("{" and "}") designate cases where a particular procedure or term would only apply under certain conditions.
  • Angle brackets ("<" and ">") designate information about the template that is for information only and will not appear in the document that is issued in a specific proceeding.

OR

<1><1 Depending on the stage of the proceeding at which access is requested, the presiding officer may be an Atomic Safety and Licensing Board or a single legal judge assisted as appropriate by technical advisors ("Special Assistants"). Typically, an Atomic Safety and Licensing Board is referred to as a "Board," while a single legal judge is referred to as a "Presiding Officer.">

<2>OR <2 As discussed in Paragraph 6, the hearing participants should confirm the Petitioner's means of complying with 10 C.F.R. § 73.22 before filing the joint motion.>

<4>

<5>

<4 In accordance with the ITAAC Hearing Procedures, a particular ITAAC proceeding will commence when a Notice of Intended Operation, a SUNSI-SGI Access Order, and an Additional Procedures Order are published together in the .> <5 This provision applies only when the Petitioner is represented by legal counsel.>

<6 As reflected in the template text, the participants should provide their SGI Access Lists in the Joint Motion.>

<8><8 The text within the curly brackets will be included if the NRC staff is to provide the initial set of SGI to the Petitioner in accordance with paragraph 17 of the Protective Order.>

Information to be protected Protection while in use or storagePreparation and marking of documents or other matter Reproduction of matter containing Safeguards Information External transmission of documents and material Processing of Safeguards Information on electronic systemsRemoval from Safeguards Information categoryDestruction of matter containing Safeguards Information OROR OR <10 Before filing the Joint Motion, the Petitioner, NRC Staff, and Licensee should discuss the availability of security storage containers and security electronic equipment meeting the requirements of 10 C.F.R. Part 73, and identify, if necessary, alternative means for storage or electronic processing of SGI; for example, an Authorized SGI Recipient without SGI-compliant equipment might use SGI-compliant equipment owned by another Authorized SGI Recipient. The Petitioner, NRC Staff, and Licensee should also discuss how storage and electronic processing of SGI will affect the options for filing SGI. Finally, as stated in the SUNSI-SGI Access Order included with the Notice of Intended Operation, the NRC staff will conduct (as necessary) an inspection to confirm that the recipient's information protection system is sufficient to satisfy the requirements of 10 C.F.R. § 73.22, and any inspection should occur before the Joint Motion is filed.> In accordance with the ITAAC Hearing Procedures, the Additional Procedures Order included with the Notice of Intended Operation would provide that any filing that is not made by the E-Filing System, fax, or email, must be made by overnight mail to ensure expedited

delivery

<12>Before filing a joint motion with a proposed protective order, the NRC Staff will check to ensure the following addresses are current.

OR OR OR <13 The participants may wish to discuss how this provision would apply to their filings given the particular facts of the proceeding and propose more specific provisions for meeting the regulatory requirement. The participants should ensure that any such specific provisions can be practically implemented under deadline pressures to avoid inadvertent disclosure of SGI.>

OR OR see OR OR OR

OR OR ORSee Statement of Policy on Conduct of Licensing Proceedings

OR OR

OR

OR

OR OR

OR