ENS 54075
From kanterella
Revision as of 07:30, 22 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ENS Event | |
---|---|
22:33 May 20, 2019 | |
Title | Potential Missed Surveillance for Isfsi |
Event Description | At approximately 1833 EDT on 5/20/2019, VC Summer Nuclear Station identified a potential missed surveillance of the Spent Fuel Storage Canister Heat Removal System Surveillance Requirement (SR) 3.1.2. This is a surveillance requirement in the Holtec CoC No. 1032 Amendment 0, Revision 1 for the HI-STORM FW. It was identified that the station suspended verifying all overpack inlets and outlets were free of blockage from solid debris or floodwater every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and began utilizing the alternate surveillance method of installed temperature monitoring equipment. However, this monitoring equipment had not been declared operable from the completion of the Dry Cask Storage Campaign on April 11, 2019. This surveillance was last performed satisfactorily on May 15, 2019.
The station has documented this missed surveillance in the Corrective Action Program under CR-19-01866. The NRC Senior Resident has been notified. The licensee stated that the temperature monitoring equipment while not operable, was functional. The licensee successfully performed the surveillance requirement on 5/21/2019. |
Where | |
---|---|
Summer South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 72.75(d)(1), ISFSI Safety System Functional Failure | |
Time - Person (Reporting Time:+18.68 h0.778 days <br />0.111 weeks <br />0.0256 months <br />) | |
Opened: | Beth Dalick 17:14 May 21, 2019 |
NRC Officer: | Thomas Kendzia |
Last Updated: | May 21, 2019 |
54075 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 54075\u003C/a\u003E - \u003Ca href=\"/Summer\" title=\"Summer\"\u003ESummer\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPotential Missed Surveillance for Isfsi\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 54075 - Summer\n","link":"","lat":34.29653611111111,"lon":-81.31628333333333,"icon":"/w/images/6/6b/South_Carolina_Electric_%26_Gas_Company_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 540752019-05-20T22:33:00020 May 2019 22:33:00
[Table view]10 CFR 72.75(d)(1), ISFSI Safety System Functional Failure Potential Missed Surveillance for Isfsi 2019-05-20T22:33:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_54075&oldid=1617627"