Forwards Completed Questionnaire on Diesel Generators
ML18086A842
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/19/1978
From: LIBRIZZI F P
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18086A841 List:
References
NUDOCS 8108060380
Download: ML18086A842 (3)


Text

---Enclosure 3 -.' .:-.. S..;":*::e E!ec:r1c <Jnd G3s Company 80 P::uk Place Newark. N.J 07101 Phone 201 430-7000 January 19, 1978 \. /o/-).: . R{ C[/V£'/\.

,,::*0. Director of Nuclear Reactor Regulation rJAN 2 Lt) _:*; U. S: Nuclear Regulatory Commission .. _ Washington, D. C. 20555

  • Y 'fooal I S$ Clftt . .J :'ti .-* ,.: . Gentlemen,

-:-:. Attached is the completed questionnaire on diesel generators.

Mr. Richard A. Silverio, Assistant to Manager -Salem Generating Station, was responsible for completing this questionnaire.

Any follow-up communications concerning this questionnaire or for arranging a site visit, should be to Mr. Herbert J. Heller, Manager -Salem Generating Station, P. O. Box 168, Hancocks Bridge, New Jersey 08038, (609) 365-7000, Extension 501. Very truly yours, \ / ._/ . // ;*:_'-(--...

'* '-, I ) F. P. Librizfi' General Manager -Electric Production 780250003

,,---81 8 i 0 723*-,, ! PDR ADOCK 05000272 ' F PDR The Energy People t, [_ * ........ . -\-" S. Are any foreign qases such as propane, freon, halon, carbon dioxide, etc. stored in the: Diesel Engine room? Yes No x or adjacent buildings?

Yes No X If yes, (other than hand portable fire extinguishers), then identify gases and give approximate tank size. 3 Gases Volume (ft ) T. Does control system automatically bypass, in emergency starting, any engine temporarily out of service for maintenance?

Yes No X If yes, then how many failures to bypass have occured? U. Does the control* system automatically override the test mode under conditions?'

Yes X No

  • V. Have repetitive mechanical failures occurred in any component part or subsystem of the engine, generator, or switch gear, etc.? Yes
  • X No If yes, then which part or sub sys tern? fuel line* to manifold 2 How failures?

Give .nature of failure. vibration cracking w. Would periodic (yearly or other) evaluation and/or testing by "outside experts" contribute significantly to the diesel-generator reliability?

Yes X No --Give brief reasons for the answer. Eperts are highly trained. and exoerienced in specific ecruioment

.........

t' .* ... . '

  • X. 1. Give the accumulated time-load operating record for each diesel-generator unit from installation to the present (Running Hours): Preoperational test Date Dec. 1975 Engine : Se ri al tJ o
  • Surv. Testing & Maintenance Hrs. No Load : Loaded . . UnavaiI:able at tnis time .. . Emergency and Other Service Hrs. : Total Hours 2. Surveillance test load (percent of continuous rating) 100% 3. Give the projected or planned time-load operation for each unJt during the next 12 months. :Surveillance

& :Maintenance Hrs. :.3 0 Emergency and other Service Hrs. Total Hours 30 . 4. Provide the follo-vling summary of the periodic surveillance testing experience:

a. b. c. d. Starting date of surveillance testing (OL date) Periodic test .interval 31 days & 18 mos. Total number of surveillance tests oerformed 24 Total number of test failures 5 * ------Jan 1976 per unit failure to start .,,.....-.....,...

__ _ failure to accept load ___ __ failure to carry load ---failures due to operator error ---failure due to conditions 5 not being operative during


e. Supply a copy of the surveillance test procedures with this .. completed questionnaire.

      • *.:: ,/'.'? . ., .... .. . * .. ;* .. * \:.:.(: ..

...

/.\ .. .,