NL-13-0187, On-Shift Staffing Analysis Supplement

From kanterella
Revision as of 06:40, 8 February 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
On-Shift Staffing Analysis Supplement
ML13037A052
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/05/2013
From: Pierce C R
Southern Nuclear Operating Co, Southern Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-13-0187
Download: ML13037A052 (2)


Text

Charles R. Pierce Regula to ry A ff a i rs D ir e ctor Southern Nuclear Operating Company, Inc. 40 Invernes s C enter Pa rk wa y Pos t Of fic e B ox 12 95 Birm i ng h am. A la bama 3 5 20 1 Tel 2 05.992.78 72 F ax 2 0 5.992.760 1 February 5 , 2013 Docket Nos.: 50-321 50-366 SOUTHERN'\

COMPANY NL-13-0187 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant On-Shift Staffing Analysis Supplement

Reference:

1. Southern Nuclear Operating Company letter to the NRC, Edwin I. Hatch Nuclear Plant On-Shift Staffing Analysis, dated January 18 , 2013 (NL-13-0065)

Ladies and Gentlemen:

By letter dated January 18 , 2013 , Southern Nuclear Operating Company (SNC) submitted Reference 1 to the Nuclear Regulatory Commission (NRC). After submitting , it was discovered that Reference 1 contained inaccurate information. As part of the on-shift staffing analysis summary, Reference 1 stated that compensatory measures had been put in place to address a conflict with performance of NRC and other site event notifications by the Shift Manager. As discussed in a phone conversation on January 24 , 2013, between Mr. Ken McElroy of SNC and Mr. Robert E. Martin of the NRC, SNC determined that the compensatory measures were not in place until January 22, 2013. A review of the on-shift staff between the dates required for compensatory measures to be in place (January 19 , 2013) and when compensatory measures were actually put in place (January 22 , 2013) show that Edwin I. Hatch Nuclear Plant had adequate staffing to meet the intent of the compensatory action with the exception of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> total. This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted , Cli. C. R. Pierce Regulatory Affairs Director CRP/CLNllac U. Nuclear Regulatory Commission NL-13-01 Page 2 Southern Nuclear Operating Company Mr. Kuczynski, Chairman, President

& Mr. G. President

& Chief Nuclear Officer Mr. R. Madison, Vice President

-Hatch Mr. B. L. lvey, Vice President

-Regulatory Affairs Mr. B. J. Adams, Vice President Fleet Operations CHA02.004 Mr. V. M. McCree, Regional Administrator Mr. R. Martin, NRR Senior Project Manager -Hatch Mr. E. D. Morris, Senior Resident Inspector

-Hatch