ML18164A138
ML18164A138 | |
Person / Time | |
---|---|
Issue date: | 06/13/2018 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20180713 | |
Download: ML18164A138 (2) | |
Similar Documents from Office of Nuclear Reactor Regulation | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20241263, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints2024-10-0202 October 2024
[Table view]Some use of "" in your query was not closed by a matching "".Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints PMNS20241266, Advanced Reactor Stakeholder Meeting2024-10-0202 October 2024 Advanced Reactor Stakeholder Meeting PMNS20241255, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2024-10-0101 October 2024 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20240792, Periodic Advanced Reactor Stakeholder Meeting2024-09-27027 September 2024 Periodic Advanced Reactor Stakeholder Meeting PMNS20241215, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22024-09-27027 September 2024 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 PMNS20241151, Advanced Methods of Manufacturing and Construction - Advance Act - Section 4012024-09-27027 September 2024 Advanced Methods of Manufacturing and Construction - Advance Act - Section 401 PMNS20241014, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemptions2024-09-26026 September 2024 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemptions PMNS20241111, Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for Grand Gulf Nuclear Station Unit 12024-09-26026 September 2024 Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for Grand Gulf Nuclear Station Unit 1 PMNS20241160, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application Status and Progress2024-09-26026 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application Status and Progress PMNS20241159, Reactor Oversight Process Public Meeting2024-09-25025 September 2024 Reactor Oversight Process Public Meeting PMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2024-09-25025 September 2024 Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML24268A3272024-09-24024 September 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions PMNS20241181, Meeting with Abilene Christian University (Acu) to Discuss the NRCs Feedback on Acus Material Control & Accounting White Paper2024-09-24024 September 2024 Meeting with Abilene Christian University (Acu) to Discuss the NRCs Feedback on Acus Material Control & Accounting White Paper PMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20241165, Preapplication Meeting Related to Planned License Amendment Request to Allow Modification of Standby Gas Treatment Common Discharge Line2024-09-23023 September 2024 Preapplication Meeting Related to Planned License Amendment Request to Allow Modification of Standby Gas Treatment Common Discharge Line PMNS20241152, Public Observation Meeting to Discuss SMR-300 Modularity Design Philosophy2024-09-22022 September 2024 Public Observation Meeting to Discuss SMR-300 Modularity Design Philosophy PMNS20241197, Closed Meeting with the Nuclear Regulatory Commission Staff and Holtec Decommissioning International, LLC (HDI) on the Biasi Critical Heat Flux Correlation for Use with the Palisades Main Steam Line Break Analysis2024-09-19019 September 2024 Closed Meeting with the Nuclear Regulatory Commission Staff and Holtec Decommissioning International, LLC (HDI) on the Biasi Critical Heat Flux Correlation for Use with the Palisades Main Steam Line Break Analysis PMNS20241140, Proposed Path Forward for Industrys Use of Institute of Electrical and Electronics Engineers Standard (IEEE) 603-2018, Criteria for Safety Systems2024-09-18018 September 2024 Proposed Path Forward for Industrys Use of Institute of Electrical and Electronics Engineers Standard (IEEE) 603-2018, Criteria for Safety Systems PMNS20241208, Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions2024-09-18018 September 2024 Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions PMNS20240791, Periodic Advanced Reactor Stakeholder Meeting2024-09-18018 September 2024 Periodic Advanced Reactor Stakeholder Meeting PMNS20241199, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241201, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241200, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application ML24261B9892024-09-17017 September 2024 Pre-Application Teleconference with Entergy Operations, Inc. to Discuss an Exemption Request for Use of Decommissioning Funds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LRM-0101) PMNS20241198, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20240725, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-16016 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241156, Pre-Submittal Meeting Regarding Joseph M. Farley Nuclear Plant, Units 1 and 2, Proposed License Amendment Request to Be Excepted from a Footnote 11 Listed in Regulatory Guide 1.183, Revision 02024-09-16016 September 2024 Pre-Submittal Meeting Regarding Joseph M. Farley Nuclear Plant, Units 1 and 2, Proposed License Amendment Request to Be Excepted from a Footnote 11 Listed in Regulatory Guide 1.183, Revision 0 PMNS20241172, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241171, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241170, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20231074, Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) S2024-09-11011 September 2024 Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Staff PMNS20241158, Meeting Between Nuclear Regulatory Commission (NRC) Staff and Nuclear Energy Institute (NEI) to Discuss Draft Rev E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems2024-09-11011 September 2024 Meeting Between Nuclear Regulatory Commission (NRC) Staff and Nuclear Energy Institute (NEI) to Discuss Draft Rev E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems PMNS20241169, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241162, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241161, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241163, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241164, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 12024-09-0606 September 2024 Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1 PMNS20241120, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22024-09-0606 September 2024 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 PMNS20241054, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review2024-09-0505 September 2024 Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review PMNS20240975, Public Meeting to Discuss NRC Staff Guidance for Power Uprate Reviews2024-09-0505 September 2024 Public Meeting to Discuss NRC Staff Guidance for Power Uprate Reviews PMNS20241119, Alternative Physical Security Requirements for Advanced Reactors Rulemaking: Public Comment Period2024-09-0303 September 2024 Alternative Physical Security Requirements for Advanced Reactors Rulemaking: Public Comment Period PMNS20240944, NRCs Annual Higher Burnup Workshop V2024-08-30030 August 2024 NRCs Annual Higher Burnup Workshop V PMNS20241083, Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.12024-08-27027 August 2024 Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.1 PMNS20241100, Quality Assurance Program Description (QAPD) Topical Report Submission by Appalachian Power Company2024-08-26026 August 2024 Quality Assurance Program Description (QAPD) Topical Report Submission by Appalachian Power Company PMNS20241055, Virtual NRC Public Meeting with the Nuclear Energy Institute (NEI) on the Status of Emergency Response Organization (ERO) White Paper, Rev. 0 and NEI 99-01, Rev. 7, Development of Emergency Action Levels for NON-PASSIVE Reactors2024-08-22022 August 2024 Virtual NRC Public Meeting with the Nuclear Energy Institute (NEI) on the Status of Emergency Response Organization (ERO) White Paper, Rev. 0 and NEI 99-01, Rev. 7, Development of Emergency Action Levels for NON-PASSIVE Reactors PMNS20241084, Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-08-21021 August 2024 Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20241102, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a2024-08-21021 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a PMNS20241097, Public Observation Meeting on SMR-300 Core Design and Discuss Verification and Validation Plans2024-08-20020 August 2024 Public Observation Meeting on SMR-300 Core Design and Discuss Verification and Validation Plans PMNS20241063, Discussion on Proposed Changes to NEI 99-02 Performance Indicators for Revision 8 and IE01 Whitepaper2024-08-15015 August 2024 Discussion on Proposed Changes to NEI 99-02 Performance Indicators for Revision 8 and IE01 Whitepaper 2024-09-06 Category:Meeting Agenda MONTHYEARPMNS20241266, Advanced Reactor Stakeholder Meeting2024-10-0202 October 2024
[Table view]Some use of "" in your query was not closed by a matching "".Advanced Reactor Stakeholder Meeting PMNS20241263, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints2024-10-0202 October 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints PMNS20241255, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2024-10-0101 October 2024 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20241215, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22024-09-27027 September 2024 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 PMNS20241151, Advanced Methods of Manufacturing and Construction - Advance Act - Section 4012024-09-27027 September 2024 Advanced Methods of Manufacturing and Construction - Advance Act - Section 401 PMNS20240792, Periodic Advanced Reactor Stakeholder Meeting2024-09-27027 September 2024 Periodic Advanced Reactor Stakeholder Meeting PMNS20241014, Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemptions2024-09-26026 September 2024 Pre-submittal Meeting on the Kairos Power LLC Operator Training and Testing Program Topical Report and Proposed Exemptions PMNS20241160, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application Status and Progress2024-09-26026 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application Status and Progress PMNS20241111, Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for Grand Gulf Nuclear Station Unit 12024-09-26026 September 2024 Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request Related to the Spent Fuel Pool Racks for Grand Gulf Nuclear Station Unit 1 PMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2024-09-25025 September 2024 Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant PMNS20241159, Reactor Oversight Process Public Meeting2024-09-25025 September 2024 Reactor Oversight Process Public Meeting PMNS20241181, Meeting with Abilene Christian University (Acu) to Discuss the NRCs Feedback on Acus Material Control & Accounting White Paper2024-09-24024 September 2024 Meeting with Abilene Christian University (Acu) to Discuss the NRCs Feedback on Acus Material Control & Accounting White Paper ML24268A3272024-09-24024 September 2024 Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-604, Revise Ventilation System Actions PMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20241165, Preapplication Meeting Related to Planned License Amendment Request to Allow Modification of Standby Gas Treatment Common Discharge Line2024-09-23023 September 2024 Preapplication Meeting Related to Planned License Amendment Request to Allow Modification of Standby Gas Treatment Common Discharge Line PMNS20241152, Public Observation Meeting to Discuss SMR-300 Modularity Design Philosophy2024-09-22022 September 2024 Public Observation Meeting to Discuss SMR-300 Modularity Design Philosophy PMNS20241197, Closed Meeting with the Nuclear Regulatory Commission Staff and Holtec Decommissioning International, LLC (HDI) on the Biasi Critical Heat Flux Correlation for Use with the Palisades Main Steam Line Break Analysis2024-09-19019 September 2024 Closed Meeting with the Nuclear Regulatory Commission Staff and Holtec Decommissioning International, LLC (HDI) on the Biasi Critical Heat Flux Correlation for Use with the Palisades Main Steam Line Break Analysis PMNS20241208, Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions2024-09-18018 September 2024 Pre-submittal Meeting to Discuss FitzPatrick License Amendment to Remove the Main Steam Line Radiation Monitor Trip and Isolation Functions PMNS20240791, Periodic Advanced Reactor Stakeholder Meeting2024-09-18018 September 2024 Periodic Advanced Reactor Stakeholder Meeting PMNS20241140, Proposed Path Forward for Industrys Use of Institute of Electrical and Electronics Engineers Standard (IEEE) 603-2018, Criteria for Safety Systems2024-09-18018 September 2024 Proposed Path Forward for Industrys Use of Institute of Electrical and Electronics Engineers Standard (IEEE) 603-2018, Criteria for Safety Systems PMNS20241198, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241199, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241200, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241201, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-17017 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application ML24261B9742024-09-17017 September 2024 Master Slide Deck - Advanced Reactor Stakeholder Meeting - 2024-09-18 ML24261B9892024-09-17017 September 2024 Pre-Application Teleconference with Entergy Operations, Inc. to Discuss an Exemption Request for Use of Decommissioning Funds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LRM-0101) PMNS20240725, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-16016 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241156, Pre-Submittal Meeting Regarding Joseph M. Farley Nuclear Plant, Units 1 and 2, Proposed License Amendment Request to Be Excepted from a Footnote 11 Listed in Regulatory Guide 1.183, Revision 02024-09-16016 September 2024 Pre-Submittal Meeting Regarding Joseph M. Farley Nuclear Plant, Units 1 and 2, Proposed License Amendment Request to Be Excepted from a Footnote 11 Listed in Regulatory Guide 1.183, Revision 0 PMNS20241171, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241169, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241170, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20231074, Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) S2024-09-11011 September 2024 Meeting to Discuss Sections of the National Organization of Test, Research and Trainingreactors, Inc. (Trtr) Proposed Guidance on the 50.59 Process for Digital Applications(Nei 23-03) with the U. S. Nuclear Regulatory Commission (NRC) Staff PMNS20241158, Meeting Between Nuclear Regulatory Commission (NRC) Staff and Nuclear Energy Institute (NEI) to Discuss Draft Rev E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems2024-09-11011 September 2024 Meeting Between Nuclear Regulatory Commission (NRC) Staff and Nuclear Energy Institute (NEI) to Discuss Draft Rev E to NEI 20-07, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C Systems PMNS20241172, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-11011 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241164, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241161, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241162, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241163, Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application2024-09-10010 September 2024 Meeting with NuScale Power, LLC on NuScale Standard Design Approval Application PMNS20241150, Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 12024-09-0606 September 2024 Meeting with Arizona Power Services Company (APS) to Discuss a Planned Alternative Pursuant to 10 CFR 50.55a(z)(1), Related to Pressurizer Thermowell Nozzle Repairs for Palo Verde Nuclear Generating Station, Unit 1 PMNS20241120, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 22024-09-0606 September 2024 Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 PMNS20241054, Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review2024-09-0505 September 2024 Periodic Public Meeting to Discuss Possible Efficiencies for the Subsequent Licenserenewal Review PMNS20240975, Public Meeting to Discuss NRC Staff Guidance for Power Uprate Reviews2024-09-0505 September 2024 Public Meeting to Discuss NRC Staff Guidance for Power Uprate Reviews PMNS20241119, Alternative Physical Security Requirements for Advanced Reactors Rulemaking: Public Comment Period2024-09-0303 September 2024 Alternative Physical Security Requirements for Advanced Reactors Rulemaking: Public Comment Period PMNS20240944, NRCs Annual Higher Burnup Workshop V2024-08-30030 August 2024 NRCs Annual Higher Burnup Workshop V PMNS20241083, Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.12024-08-27027 August 2024 Pre-submittal Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant, Unit 2, Alternative Related to Main Steam Safety Valve Surveillance Requirement 3.7.1.1 PMNS20241100, Quality Assurance Program Description (QAPD) Topical Report Submission by Appalachian Power Company2024-08-26026 August 2024 Quality Assurance Program Description (QAPD) Topical Report Submission by Appalachian Power Company PMNS20241055, Virtual NRC Public Meeting with the Nuclear Energy Institute (NEI) on the Status of Emergency Response Organization (ERO) White Paper, Rev. 0 and NEI 99-01, Rev. 7, Development of Emergency Action Levels for NON-PASSIVE Reactors2024-08-22022 August 2024 Virtual NRC Public Meeting with the Nuclear Energy Institute (NEI) on the Status of Emergency Response Organization (ERO) White Paper, Rev. 0 and NEI 99-01, Rev. 7, Development of Emergency Action Levels for NON-PASSIVE Reactors PMNS20241084, Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 32024-08-21021 August 2024 Presubmittal Meeting with Arizona Public Service Company Regarding a Nuclear Fuels Related License Amendment Request for Palo Verde Nuclear Generating Station, Units 1, 2, and 3 PMNS20241102, Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a2024-08-21021 August 2024 Meeting with Tennessee Valley Authority to Discuss a Proposed Sequoyah Nuclear Plant License Amendment Request to Revise Technical Specs 3.3.6 and 3.9.4 Related to Containment Isolation/Penetrations and the Fuel Handling a PMNS20241097, Public Observation Meeting on SMR-300 Core Design and Discuss Verification and Validation Plans2024-08-20020 August 2024 Public Observation Meeting on SMR-300 Core Design and Discuss Verification and Validation Plans 2024-09-06 |
Text
June 13, 2018 Title: Oyster Creek Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPID L-2018-LRO-0022)
July 17, 2018, 06:00 PM to 09:00 PM Date(s) and Time(s):
Location: Community Hall - Lacey Township 101 North Main Street Forked River, NJ Category: This is a Category 3 meeting. Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.
Purpose: A notice of receipt; availability; the purpose of the public meeting; and request for comments on the Oyster Creek Nuclear Generating Station PSDAR, including the Decommissioning Cost Estimate, was published in the Federal Register on June 11, 2018 (83 FR 27033).
Contact: John G. Lamb 301-415-3100 John.Lamb@nrc.gov NRC John G. Lamb, Office of Nuclear Reactor Regulation Douglas A. Broaddus, Office of Nuclear Reactor Regulation Bruce A. Watson, CHP, Office of Nuclear Material Safety and Safeguards Zahira L. Cruz, Office of Nuclear Material Safety and Safeguards Richard S. Barkley, Region I Participants:
External Jeffrey Dostal, Exelon Nuclear Docket No:
05000219
PUBLIC MEETING AGENDA
Oyster Creek Post-Shutdown Decommissioning Activities Report (PSDAR) Public Meeting (EPID L-2018-LRO-0022)
July 17, 2018, 06:00 PM to 09:00 PM Community Hall - Lacey Township 101 North Main Street Forked River, NJ The time of the meeting is local to the jurisdiction where the meeting is being held.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If reasonable accommodation is needed to participate in this meeting, or if a meeting notice, transcript, or other information from this meeting is needed in another format (e.g., Braille, large print), please notify the NRC meeting contact.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
ADAMS Accession Number:
ML18164A138 Distribution:
Name JLamb JBurkhardt BWatson DBroaddus JLamb Office NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NMSS/DUWP/RDB/BC NRR/DORL/LSPB/BC NRR/DORL/LSPB/PM Date 06/12/2018 06/13/2018 06/13/2018 06/13/2018 06/13/2018 OFFICIAL RECORD COPY https://www.nrc.gov/pmns/mtg?do=details&Code=20180713 Link to meeting details:
Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" 67 Federal Register 36920, May 28, 2002 The policy statement may be found on the NRC website http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html