Advises of Util Intent to Implement Formal Industry Position on Severe Accident Mgt
ML18153B265
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/23/1995
From: OHANLON J P
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
95-130, NUDOCS 9503310029
Download: ML18153B265 (2)


Text

e e .. VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 23, 1995 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 SEVERE ACCIDENT MANAGEMENT Serial No. NL&P/MAE:

Docket Nos. License Nos.95-130 R1 50-280/-281 50-338/-339 DPR-32/-37 NPF-4/-7 Virginia Electric and Power Company (Virginia Power) intends to implement the formal industry position on severe accident management which was approved by the Nuclear Energy lnstitute's (NEl's) Nuclear Strategic Issues Advisory Committee on November 4, 1994. That formal position, previously communicated to the NRC by NEI in a letter dated November 21, 1994, states that each licensee will:

  • Assess current capabilities to respond to severe accident conditions using Section 5 of NEI 91-04, Revision 1, "Severe Accident Issue Closure Guidelines."
  • Implement appropriate improvements identified in the assessment, within the constraints of existing personnel and hardware, on a schedule to be determined by each licensee and communicated to the NRC, but in any event no later than December 31, 1998. Based on previous interactions between NEI and the NRC staff, we understand that the NRC staff agrees with the need for licensee flexibility in their methods of assessing and establishing severe accident management guidance.

Utilizing the associated implementing guidance (contained in NEI Report 91-04, Revision 1 ), we are currently scheduled to complete the assessment of severe accident management capabilities and make any identified enhancements by July 31, 1997. If you have any questions, please contact us. Very truly yours, James P. O'Hanlon Senior Vice President

-Nuclear ---~-------------


* -*~,\ . 9503310029 950323 PDR ADDCK 05000280 P. PDR e "* *-* cc: Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Mr. L. B. Engle U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. B. C. Buckley U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Mr. R. D. McWhorter NRC Senior Resident Inspector North Anna Power Station Mr. David Modeen Nuclear Energy Institute 1776 I Street Suite 400 Washington, D. C. 20006-3708 Mr. William H. Rasin Nuclear Energy Institute 1776 I Street Suite 400 Washington, D. C. 20006-3708