ML18289A625

From kanterella
Revision as of 10:59, 11 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Burden Tables for Final Supporting Statement for Renewal of 10 CFR Part 40, Domestic Licensing of Source Material (3150-0020) (2018)
ML18289A625
Person / Time
Issue date: 11/15/2018
From: Celimar Valentin-Rodriguez
NRC/NMSS/DMSST/MSLB
To:
Valentin-Rodriguez C
Shared Package
ML18289A602 List:
References
Download: ML18289A625 (18)


Text

SectionDescriptionNRC licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.9(b)Notification to the Commission of information with significant implication for public health and safety or common defense and security 0 1 0 1 040.14Exemption request 0 1 0 1 040.26(c)(2)Notification of of any failure in a tailings or waste retention system 0 1 0 2 040.41(f)Notification of a voluntary or involuntary petition for bankruptcy 0 1 0 1 040.42(d)Notification of ceasing activities due to expiration of license or not conducting activities for 24 months 1 1 1 8 840.42(f)Request to delay or postpone decommissioning process 1 1 1 40 4040.42(g)(2)Request for alternate schedule for decomissioning 1 3 3 40 12040.42(j)(2)Radiation survey 0 1 0 100 040.46(b)Application for transfer of license 1 1 10.50.540.60(a)Report within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the discovery of an event that prevents immediate protective actions necessary to avoid exposures to radiation or radioactive materials that could exceed regulatory limits 0 1 0 4 040.60(b)Notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of unplanned contamination event, equipment failure, the discovery of an event that prevents immediate protective actions necessary to avoid exposures to radiation or radioactive materials that could exceed regulatory limits, or unplanned fire or explosion 1 1 1 4 440.60(c)(2)Event notification by telephone 0 1 0 4 040.65Effluent monitoring reports 1 2 2 15 30Appendix A and 40.31(h)Submittal by mill operators of definitive programs meeting specified criteria in five major categories 0 0 0 0 0Criterion 5A(3)Exemption request for placing a liner to prevent migration of wastes 0 1 0 10 0Criterion 5DSubmittal of proposed corrective action program and supporting rationale for exceeding ground water protection standards under Criterion 5b(1) 1 1 1 5 5Criterion 5G [includes 40.26(d)]Information in support of applicant's tailings disposal system 1 1 1 20 20Criterion 5HSteps taken during stockpiling of ore to minimize penetration of radionuclides into underlying soils 0 1 0 1 0Criterion 6(4)90-day report of verification of effectiveness of final radon barrier over uranium mill tailings in controlling radon emissions 0 1 0 5 0Criterion 6AReclamation plan for impoundments containing uranium byproduct materials 0 1 0 20 0Criterion 8Notification of cessations, corrective actions, and restarts of yellowcake stack emission control equipment operation 1 1 1 10 10Criterion 8ARecords of daily inspections of tailings or waste retention systems 1 1 1 5 5Criterion 9(b)Financial assurance arrangements for decontamination and decommissioning 1 3 3 20 60Criterion 1290-day report of results of annual inspections of all sites under licensee's jurisdiction 1 1 1 20 20Subtotal 3 17322.5Uranium Recovery Active Program Uranium Recovery Decommissioning Program SectionDescriptionNRC licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.9(b)Notification to the Commission of information with significant implication for public health and safety or common defense and security 2 1 2 1 240.14Exemption request 2 1 2 1 240.25(d)(4)30-day report of transfer of depleted uranium under 40.25 0 1 0 1 040.27(c)(3)Changes to Long-Term Surveillance Plan (LTSP) by GLs for custody of long-term care of a residual radioactive material disposal site 0 1 0 8 040.27(c)(5)Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of a residual radioactive material disposal site 0 1 0 2 040.28(c)(3)Changes to LTSP by GLs for custody of long-term care of uranium or thorium product material disposal site 0 1 0 8 040.28(c)(5)Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site 0 1 0 2 040.31(I) (Burden included under 40.36)Applicant's provision for liability insurance 0 0 0 0 040.35(f)Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan 0 1 0 80 040.36(a)&(b) DFPsDFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form 0 1 0 160 040.36(c)(1)&(2)FA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) 5 1 5 4 2040.36(c)(5) Submittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP) 0 1 0 40 040.36(c)(5)Licensees amending DFPs 0 1 0 16 040.36(d)Updates to cost estimates for decommissioning 5 1 5 8 4040.36(e) CertificationAcceptable methods for providing FA through cert or funding plan 0 1 0 40 040.41(f)Notification of bankruptcy under Title 11 0 1 0 1 040.42(d)60-day notification to being decommissioning site or 12-month notification of decommissioning plan 0 1 0 8 040.42(e)(2)Reduction of FA 0 1 0 40 040.42(f)Request to delay or postpone initiation of decommissioning process 0 1 0 40 040.42(g)(1)Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC 0 1 01,000 040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 0 1 0 40 040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 5 1 5 100 500 SectionDescriptionNRC licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 0 1 00.5 040.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 0 1 0 1 040.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 0 1 0 4 040.60(c)(2)Event notification by telephone 0 1 0 1 0Subtotal 519.0564.040.9(b)Notification to the Commission of information with significant implication for public health and safety or common defense and security 0 1 0 1 040.14Exemption request 0 1 0 1 040.23DFP or Certification of FA for DFP under 40.36 0 1 0 2 040.31(j)(1)& (3)(viii)Emergency plans & maximum intake evaluations for UF6 possession applications 1 1 1 160 16040.35(f)Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan 0 1 0 80 040.36(a)&(b)DFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form 0 1 0 160 040.36(c)(1)&(2)FA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) 0 1 0 4 040.36(c)(5)Submittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP) 0 1 0 40 040.36(c)(5)Licensees amending DFPs 0 1 0 16 040.36(d)Updates to cost estimates for decommissioning 0 1 0 8 040.36( e)Acceptable methods for providing FA through cert or funding plan 0 1 0 40 040.41(f)Notification of bankruptcy under Title 11 0 1 0 1 040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 0 1 0 40 040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 0 1 0 100 040.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 2 1 20.5 1Fuel Cycle Program SectionDescriptionNRC licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 0 1 0 4 040.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 1 4 4 4 1640.60(c)(2)Event notification by telephone 0 1 0 1 040.64(b)Yearly statement of foreign origin source material inventory for licensee's possessing more than 1000 kg of uranium/thorium/combination of both 0 1 0 2 040.64(c)Notifications of theft to NRC/HOO and follow-up notifications 0 1 02.5 040.65Semiannual reports of quantities of radioactive materials released to unrestricted areas (for source material in uranium milling, UF6 production, uranium enrichment facility) 0 1 0 15 040.66 (Burden included in 40.23, above)Notification of export of natural uranium other than ore/ore residue 0 1 0 0Subtotal 2 7 17740.9(b)Notification to the Commission of information with significant implication for public health and safety or common defense and security 1 1 1 1 140.13(a)Voluntary notification of transfer of source material (less than 0.05% by weight) to persons exempt from licensing 2 1 2 100 20040.14Exemption request 0 1 0 1 040.22(b)(4)Response to NRC written request by GLs 4 1 4 1 440.22(c)Notification of significant contamination identified by GL when activities permanently ceased 0 1 0 20 040.23, 40.66, & 40.67GL report of transient shipment; Advanced notifications of import/export of natural uranium; 0 1 0 1 040.25(d)(4)30-day report of transfer of depleted uranium under 40.25 1 1 1 1 140.31(i) [included in 40.36]Applicant's provision for liability insurance 0 1 0 1 040.35(b)Labeling requirement for devices containing DU 0 1 00.5 040.35(e)Transfer reports of industrial product & devices containing DU 0 1 00.75 040.35(f)Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan 0 1 0 80 040.36Submittals of DFPs and FA 30 1 30 1 3040.41(f)Notification of bankruptcy under Title 11 1 1 1 1 140.42(d)60-day notification to being decommissioning site or 12-month notification of decommissioning plan 1 1 1 8 840.42(e)Reduction of FA 0 1 0 40 040.42(f)Request to delay or postpone initiation of decommissioning process 0 1 0 40 0Materials Program SectionDescriptionNRC licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.42(g)(1)Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC 0 3 01,000 040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 1 1 1 40 4040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 6 1 6 100 60040.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 3 1 30.51.540.53(c)Exempt distribution reports 15 1 150.57.540.55(d)(1)Source material transfers to 40.22 GLs 0 1 00.6 040.55(d)(2)Source material transfers to 40.22 GLs 0 5 00.3 040.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 2 1 2 4 840.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 3 1 3 4 1240.60(c)(2)Submittal of telephone reports under 40.60(a) and 40.60(b) 2 1 2 1 240.64(b)Yearly statement of foreign origin source material inventory for licensee's possessing more than 1000 kg of uranium/thorium/combination of both 0 1 0 2 040.64(c)Notifications of theft to NRC/HOO and follow-up notifications 0 1 02.5 0Subtotal 72 72 916TOTAL 82115.01979.5 SectionDescriptionAS licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.9(b)Notification to regulatory authority of information with significant implication for public health and safety or common defense and security 17 1 17 1 1740.14Exemption request 0 1 0 1 040.26(c)(2)Notification of of any failure in a tailings or waste retention system 17 1 17 2 3440.27(c)(3)Changes to Long-Term Surveillance Plan (LTSP) by GLs for custody of long-term care of a residual radioactive material disposal site 0 1 0 8 040.27(c)(5)Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of a residual radioactive material disposal site 0 1 0 2 040.28(c)(3)Changes to LTSP by GLs for custody of long-term care of uranium or thorium product material disposal site 0 1 0 8 040.28(c)(5)Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site 0 1 0 2 040.41(f)Notification of a voluntary or involuntary petition for bankruptcy 0 1 0 1 040.42(d)Notification of ceasing activities due to expiration of license or not conducting activities for 24 months 2 1 2 8 1640.42(f)Request to delay or postpone initiation of decommissioning process 17 1 17 40 68040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 2 1 2 100 20040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 0 1 0 100 040.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 0 1 00.5 040.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 8 1 8 4 3240.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 8 1 8 4 3240.60(c)(2)Event notification by telephone 8 1 8 4 3240.65Semiannual reports of quantities of radioactive materials released to unrestricted areas (for source material in uranium milling, UF6 production, uranium enrichment facility) 17 1 17 15 255Uranium Recovery Active Program SectionDescriptionAS licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden HoursAppendix A and 40.31(h)Submittal by mill operators of definitive programs meeting specified criteria in five major categories 0 1 0 100 0Criterion 5A(3)Exemption request for placing a liner to prevent migration of wastes 17 1 17 10 170Criterion 5DSubmittal of proposed corrective action program and supporting rationale for exceeding ground water protection standards under Criterion 5b(1) 17 1 17 5 85Criterion 5G [includes 40.26(d)]Information in support of applicant's tailings disposal system 1 1 1 20 20Criterion 6(4)90-day report of verification of effectiveness of final radon barrier over uranium mill tailings in controlling radon emissions 1 1 1 5 5Criterion 6AReclamation plan for impoundments containing uranium byproduct materials 1 1 1 20 20Criterion 8Notification of cessations, corrective actions, and restarts of yellowcake stack emission control equipment operation 17 1 17 10 170Criterion 8ARecords of daily inspections of tailings or waste retention systems 17 1 17 5 85Criterion 9(b)Financial assurance arrangements for decontamination and decommissioning 17 1 17 20 340Criterion 1290-day report of results of annual inspections of all sites under licensee's jurisdiction 1 1 1 20 20Subtotal 17 185 221340.9(b)Notification to regulatory authority of information with significant implication for public health and safety or common defense and security 0 1 0 1 040.14Exemption request 0 1 0 1 040.25(d)(4)30-day report of transfer of depleted uranium under 40.25 0 1 00.5 040.28(c)(5)Significant construction, actions, or repairs related to the disposal site by GLs for custody of long-term care of uranium or thorium product material disposal site 4 1 4 2 840.35(f)Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan 0 1 0 80 040.36(a)&(b) DFPs, and 40.31(i)DFP for licensees with more than 100 mCi of source mateiral in readily dispersible form; DFP for licensees between 10 mCi and 100 mCi or source material in readily dispersible form 2 1 2 160 32040.36(c)(1)&(2), one time onlyFA for decommissioning (before 7/27/1990); DFP & FA for decommissioning (after 7/27/1990) 3 1 3 4 1240.36(c)(5) Licensees switching from cert. to DFPSubmittal of DFP if surveys under 20.1501(a) would prevent site from meeting 20.1402 (for licensees switching from cert. to DFP)0 1 0 40 040.36(c)(5) Licensees amending DFPsLicensees amending DFPs 2 1 2 16 32Uranium Recovery Decommissioning Program SectionDescriptionAS licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.36(d), once every three yearsUpdates to cost estimates for decommissioning 4 1 4 8 3240.36(e) CertificationAcceptable methods for providing FA through cert or funding plan 2 1 2 40 8040.41(f)Notification of bankruptcy under Title 11 0 1 0 1 040.42(d)60-day notification to being decommissioning site or 12-month notification of decommissioning plan 0 1 0 8 040.42(e)(2)Reduction of FA 3 1 3 40 12040.42(f)Request to delay or postpone initiation of decommissioning process 0 1 0 40 040.42(g)(1)Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC 0 1 01,000 040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 0 1 0 40 040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 4 1 4 100 40040.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 4 1 40.5 240.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 0 1 0 4 040.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 1 1 1 15 1540.60(c)(2)Event notification by telephone 0 1 0 40 0Subtotal 1429.01021.040.9(b)Notification to regulatory authority of information with significant implication for public health and safety or common defense and security 7 1 7 1 740.13(a)Voluntary notification of transfer of source material (less than 0.05% by weight) to persons exempt from licensing 13 1 13 100 130040.14Exemption request 0 1 0 1 040.22(b)(4)Response to NRC written request by GLs 26 1 26 1 2640.22(c)Notification of significant contamination identified by GL when activities permanently ceased 3 1 3 20 6040.25(d)(4)30-day report of transfer of depleted uranium under 40.25 7 1 70.53.540.35(b)Labeling requirement for devices containing DU 2 1 20.5 140.35(e)Transfer reports of industrial product & devices containing DU 2 1 20.751.5Materials Program SectionDescriptionAS licensee respondentsResponses per RespondentResponsesBurden per ResponseTotal Annual Burden Hours40.35(f)Submittal of emergency plan under 40.31 within 6 months for any change to the plan which decreases effectiveness of plan 0 1 0 80 040.36Submittals of DFPs and FA 195 1 195 1 19540.41(f)Notification of bankruptcy under Title 11 7 1 7 1 740.42(d)60-day notification to being decommissioning site or 12-month notification of decommissioning plan 7 1 7 8 5640.42(e)(2)Reduction of FA 0 1 0 40 040.42(f)Request to delay or postpone initiation of decommissioning process 0 1 0 40 040.42(g)(1)Submittal of DFP if required by license condition or if decommissioning procedures not previously approved by NRC 0 1 01,000 040.42(g)(2)Request for approval of an alternate schedule for submittal of a decommissioning plan 7 1 7 40 28040.42(j)(2)Submittal of report on results of radiation surveys of premises where activities were carried out 39 1 39 100 390040.46(b)Submittal of identity, technical and financial qualifications of the proposed transferee, and the information on financial assurance for decommissioning required by 10 CFR 40.36 or Appendix A 20 1 200.5 1040.55(d)(1)Source material transfers to 40.22 GLs 0 1 00.6 040.55(d)(2)Source material transfers to 40.22 GLs 0 5 00.3 040.60(a)4-hour notification of of events or conditions that threaten the health and safety of individuals using licensed material or that prevent the performance of surveys or other safety-related duties 13 1 13 4 5240.60(b)24-hour notification of unplanned contamination event; event where equipment is disabled or failed to function as designed; events requiring unplanned medical treatment of contaminated individual; unplanned fires or explosions of devices/containers/equipment containing licensed material 20 3 60 4 24040.60(c)(2)Submittal of telephone reports under 40.60(a) and 40.60(b) 13 1 13 1 13Subtotal 381 421 6152TOTAL 412635.09386.0 SectionDescriptionNRC Licensee recordkeepersHours per RecordkeeperTotal Annual Burden Hours40.26(c)(2)Daily tailings or waste retention system inspections (3 years after inspection is conducted) 34.312.940.51(c)&(d)(Until license termination) 34.513.540.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 35.115.340.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 33.29.640.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 3 2 640.61(f)Forwarding FA records to Regional Office prior to license termination 36.419.2Appendix ARecords relating to operation of uranium mills & disposition of tailings or wastes (until license termination) 3 96 288Subtotal 3364.540.36(f)Records maintained until site released for unrestricted use 512.2 6140.51(c)&(d)(Until license termination) 54.522.540.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 55.125.540.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 53.2 1640.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 5 2 1040.61(f)Forwarding FA records to Regional Office prior to license termination 56.4 32Subtotal 5 16740.51(c)&(d)(Until license termination) 24.5 940.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 25.110.240.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 23.26.440.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 2 2 440.61(f)Forwarding FA records to Regional Office prior to license termination 26.412.8Subtotal 242.440.35(e)(3)3 year retention for reports under 40.35( e) 00.3 040.51(c)&(d)(Until license termination) 791.5118.540.53(c)(6)1 year retention for exempt distribution reports 15 4 6040.55(e)Record retained for 1 year after event included in report to NRC or Agreement State 0 4 0Uranium Active Recovery ProgramUranium Recovery Decommissioning ProgramFuel Cycle ProgramMaterials Program SectionDescriptionNRC Licensee recordkeepersHours per RecordkeeperTotal Annual Burden Hours40.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 79 1 7940.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 03.2 040.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 0 2 040.61(f)Forwarding FA records to Regional Office prior to license termination 791.5118.5Subtotal 79 376TOTAL 89949.9 SectionDescriptionAS Licensee recordkeepersHours per RecordkeeperTotal Annual Burden Hours40.26(c)(2)Daily tailings or waste retention system inspections (3 years after inspection is conducted) 174.373.140.51(c)&(d)(Until license termination) 174.576.540.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 175.186.740.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 173.254.440.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 17 234.040.61(f)Forwarding FA records to Regional Office prior to license termination 176.4108.8Appendix ARecords relating to operation of uranium mills & disposition of tailings or wastes (until license termination) 17 961632.0Subtotal 172065.540.36(f)Records maintained until site released for unrestricted use 1412.3172.240.51(c)&(d)(Until license termination) 144.5 6340.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 145.171.440.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 143.244.840.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 14 2 2840.61(f)Forwarding FA records to Regional Office prior to license termination 146.489.6Subtotal 14 46940.35(e)(3)3 year retention for reports under 40.35( e) 00.3 040.51(c)&(d)(Until license termination) 5141.5 77140.55 (e)Record retained for 1 year after event included in report to NRC or Agreement State 1 4 4Uranium Active Recovery ProgramUranium Recovery Decommissioning ProgramMaterials Program SectionDescriptionAS Licensee recordkeepersHours per RecordkeeperTotal Annual Burden Hours40.61(a)&(b)Receipt of material (as long as material possessed & 3 yrs following transfer); Transfer of material (until license termination); Disposal of material (until license termination) ; If no retention period specified, until license termination 514 1 51440.61(d)Forwarding records of unsealed source material to Regional Office prior to license termination 03.2 040.61(e)Forwarding records of unsealed source material to new licensee prior to license transfer 0 2 040.61(f)Forwarding FA records to Regional Office prior to license termination 5141.5 771Subtotal 514 2060TOTAL 5454594.5 SectionDescriptionNumber of RespondentsResponses per RespondentResponsesBurden per responseTotal Annual Burden Hours40.53(b)Labeling requirements and instructions to user 6 1 6 3 1840.55(a)Labeling requirements "radioactive material" 0 1 0 3 040.55(c)Copy of 40.22 & 40.51 to GLs prior to source material transfer 0 1 0 3 0Total 6 6 18Materials Program SectionDescriptionNumber of RespondentsResponses per RespondentResponsesBurden per responseTotal Annual Burden Hours40.55(c)Copy of 40.22 & 40.51 to GLs prior to source material transfer 0 1 0 3 0Total 0 0 0Materials Program BurdenResponsesCost @$263Reporting1,979.5115.0$520,609Recordkeeping949.989.0$249,824Third party disclosure18.06.0$4,734Total2,947.4210.0$775,166BurdenResponsesCost @$263Reporting9,386.0635.0$2,468,518Recordkeeping4,594.5545.0$1,208,354Third party disclosure0.00.0$0Total13,980.51,180.0$3,676,872BurdenResponsesCost @$263Reporting11,366 750$2,989,258Recordkeeping5,544 634$1,458,072Third party disclosure 18 6$4,734Total16,9281,390$4,452,064BurdenCost @$263/hrUranium recovery (active)4,966$1,306,058Uranium recovery (decommisioning)2,221$584,123Fuel cycle 219$57,597Materials9,522$2,504,286Total16,928$4,452,064Total Burden (NRC Licensees)Total Burden (Agreement State Licensees)Total Burden (All Licensees)

RespondentsNRC licenseesAS licenseesTotalUranium recovery (Active) 3 17 20Uranium recovery decommissioning 5 14 19Fuel cycle 2 0 2Materials 79 514 593Total 89 545 634 BurdenResponsesBurdenResponsesBurdenResponsesReporting 2773 1881,979.5115.0-793.5-73.0Recordkeeping 2257 172949.989.0-1,307.1-83.0Third party disclosure 6 218.06.012.04.0Total 5036 3622,947.4210.0-2,088.6-152.0BurdenResponsesBurdenResponsesBurdenResponsesReporting 1709 2009,386.0635.07,677.0435.0Recordkeeping 3677 7174,594.5545.0917.5-172.0Third party disclosure 3 10.00.0-3.0-1.0Total 5389 91813,980.51,180.08,591.5262.0BurdenResponsesBurdenResponsesBurdenResponsesReporting 4482 38811,366 7506,884 362Recordkeeping 5934 8895,544 634-390-255Third party disclosure 9 3 18 6 9 3Total 10425 128016,9281,3906,503 110NRC licenseesAS licenseesNRC licenseesAS licenseesNRC licenseesAS licenseesUranium recovery (active) 10 8 3 17-7 9Uranium recovery (decommissioning) 11 13 5 14-6 1Fuel cycle 2 0 2 0 0 0Materials 155 700 79 514-76-186Total 178 721 89 545-89-176RESPONDENTSIN ROCISCURRENT REQUESTCHANGEIN ROCISCURRENT REQUESTCHANGECHANGE IN BURDEN AND RESPONSES - ALL LICENSEESIN ROCISCURRENT REQUESTCHANGECHANGE IN BURDEN AND RESPONSES - AGREEMENT STATE LICENSEESCHANGE IN BURDEN AND RESPONSES - NRC LICENSEESIN ROCISCURRENT REQUESTCHANGE